Ref. No. : CA - 31906 - (Production - Extrusion – with 20 years in Plastic Industry)

Education

Mechanical Engineering 70.00% from IIMP NGPUR in Dec-2009

Work Experience

VP (Operational) Pant head
From SEP 1th 2020 To till Date.
Company profile- Manufacturer of Stainless Steel Welded Pipes, Stainless Steel Erw & Welded Pipes & Stainless Steel 304 Pipes

GM (Operational) Pant head
From July 1th 2017 To 2020 .
Company profile- Manufacturing Company

MS/ Lloyds line pipes ltd (M.H) Apl Apollo group
MS Steel As MANAGER in production div
From Jan 15th 2016 To March 2017.

MS/ TIGER STEEL INDUSTRES ABU DHABI (U.A.E)
MS Steel As production head
From Nov 19th2014 to 1 jan2016.

RAVIRAN VINNYAM PVT (BRG GROUP) ERW
Stainless Steel
Manager in production division Aug 2012 to 15 nov 2014.

JINDAL PIPES LTD Jindal Nagar Ghaziabad (JINDAL GROUP) ERW
Black and galvanized steel pipes& tube production division.
As SrEngineer July 2011 to Dec 2012.

Nov’2007 to July’ 2011 ANS Steel Tubes Ltd
Plot No.268, Sec-24, Faridabad (H.R)
(An ISO 9001: 2000 Certified Company)
Working as Engineer in prod div

May’2005 to Apr ’2007
Bhushan steel & strips Ltd
Khopoli, Raigad (M.H)
An ISO 9001: 2000 Certified Company
Working as supervisor in Q.A.D DIV

Operations
ERW tube production (MS: SS: AL cut).
In process & online inspection &testing of Tubes.
To prepare the test certificate of dispatch material.
Pre dispatch inspection as per schedule of dispatch plan and production plan.
Handling all testing equipments like Hardness Tester (Rockwell &Vickers’s), Eric she Cupping Value Tester, Tensile Testing (UTE-40) & Gauge setting.
Handling the microscope & policing mach for checking the bead flow of tube.
Maintaining all documents as per ISO requirements.
Ensure proper Housekeeping, Kaizen & 5S.
Maintaining P P A P documents related to new developments.(Quality system)
Handling the Customer complaints & raising the corrective & Preventive action.

Responsibilities

Maintaining work process instruction & records as per ISO 9001; 2000.
We know how to produce maximum production with minimum scrap percentage & required optimum quality.
I am making these types of tubes are ROUND, SECTION & OVAL and working FC system.
Testing the performance and reliability for automobile tube and tubular components ( Incl. Mechanical properties).
Imparting continuous on job training to the workforce for enhancing their productivity & operational efficiencies.
Handling the calibration of inspection, measuring & test equipment and their inspection to minimize errors & bugs.
Working in ERP system.
Man power planning & handling.
Attend specification meeting with customer for new product development & save clarification is there, get it clear from customer.
To coordinate with all the down line persons & reporting to the undersigned.
Tube mill roll maintenance and development of new size.
Handling the microscope & polishing match for checking the bead flow of tubes.
Ensure proper Housekeeping, Kaizen & 5S.
Solving technical problem, breakdown maintenance.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com