From -Mar-2022 to till date
Company profile - The leading BOPP & CPP films manufacturer
Job profile -
Material Planning & Purchasing for Local and Import Supplier (Italy,
Netherland, Belgium, Algeria, GCC, Singapore, Thailand, India etc). Managed & procured the raw materials for BOPP, CPP & Stretch Films in
different categories like Homopolymers Resins, Copolymers Resins,
Masterbatches, Aluminum, Packing material, like Pallets, Wood, Plywood,
Paper cores, Corrugated boxes from 20 Suppliers, 450 SKUs, monthly
purchase volume 55 Million SAR.
Reduced the inventory from 22 DOC to 17 DOC realized the savings of 0.55
Million SAR, with vendor wise study of lead time and Material arrival
patterns. Achieved the cost saving of 0.45 Million SAR/Annum, by re-using the pallet
received from one vendor to dispatch the finished good to local customer. Ensured no line stoppage by proper Scheduling, material connectivity, Price
negotiation for on time raw material availability and inventory management optimization
Deputy Manager- Material Planning and Purchasing
From - July-2020 to Mar-2022
Company profile -packaging for food, beverage, pharma, medical, home- and personal-care
Job profile -
Managed a team of 3 Buyers (2 for Direct Material + 1 for indirect
Procurement).
Material Planning & Purchasing for Local and Import Supplier (UAE,
Singapore, Thailand, China, USA, Australia) as well as inter plant supplies).
Managed & procured the material in different categories like PET, BOPP,
CPP, Foil, Polyethene, Polymer Resin, Solvent, Adhesive & Hardener, from
25 Suppliers, 500 SKUs, monthly purchase volume 250 Million INR.
Ensured zero line stoppage by proper Scheduling, material connectivity,
Price negotiation for on time raw material availability and inventory
management optimization.
Created 2 Milk run route for PET, BOPP, Poly Supplier suppliers and
reduced the vehicle unloading time from 24 HRs to 12 Hours.
Managed job work for polyethylene material through different job worker (Volume: 750 MT ,85 Million INR, 7 Job worker)
Sr. Engineer-Demand Planning and Production Planning & Control
Nov16 to July21
Bosch