Ref. No. : CA - 33311 - (Production - Moulding – with 7.2 years in Plastic Industry)

Education

PG DCA ( Post Graduate Diploma In Computer Application )
Diploma in plastics technology (PGD-,PPT)Passed with 1st Div. 77.80% from CIPET Balasore Odisha in 2018.
Graduation with 1st Div 60% from Utkal University Odisha 2016.

Skill Sets

SAP, Ms-Excel , Ms- word,power-point, Email service,Browsing..

Work Experience

Production Engineer
From -13-10-2020 T0 Continue
Company profile - manufacturing a new identity in India. It has introduced path breaking innovations and accessories like new generation switches, home automation, Bluetooth music players, home security products, switch gears and brilliant contemporary range in LED lighting and luminaries that have transformed peoples lives tremendously.

Job profile -
To work as an independent owner of respective shift.
To handle manpower in own shift.
To support the production process for handling and preserving of raw material, components and scrap.
Make the scrap report and production daily basis and send to H.O.D.
Take trail of new mould and make trial report.
Train to new manpower with proper PPE.
Maintain 5S in own respective area.
Focus on KAIZEN for better improvement.
Generate issue slip according to plan.
Maintain the OEE to avoid rejection and downtime.
Find out problems solve it as possible as in perfect way.
Follow the SAFETY factor during work.
To adopt discipline and best business practices in Plastic Molding Shop for efficient and effective
Functioning.

Shift Engineer
From - 01-08-2018 TO 08-10-2021
Company profile - manufactures automobile components

I have been successfully working independently as a Shift Engineer of World Class /Injection molding shop floor containing higher tonnage injection molding machines up to 2000Ton.
I expertise with below:

PRODUCTION PROCESS:Practical experience off process setup, trouble shooting with less rejection.
RAW MATERIAL PROCESSED:HIPS,PBT,ABS,PVC,PA6&66,PP,LDPE,LLDPE,HDPE
MACHNES HANDLE: Ferromatic 450 T- 1500T, Toshiba 450T, JSW-300 T, L&T 180,ENGEL 250,WINDSOR, PRIKAN, ELECTRONICA.
MOULD TYPE:2 PLATE , 3PLATE, MGO sequence type, Core(hydraulic & pneumatic).
ANCILLARY/UTILITY HANDLED:Chiller, Raw material conveying(Toshiba), Air-compressor
HRTC (yodo),Mould master.HRS Flow.
MTC -witmann, TOSHIBA , l&t.
PPC: To follow up daily production planning control organise mold changes on daily basis with priorities best mold & m/c combination. Monitored required R/M, MB, Packing accessories (box, polybag, trolleys) as per respective to run all planned moulds without stoppage..
REPORT: To prepare shift production report based hourly production report of every machine, mold unloading report , Breakdowns reports, Rejection analysis report etc.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com