Ref. No. : CA - 33217 - (Production - Extrusion – with 13.7 years in Plastic Industry)

Education

POST DIPLOMA IN PLASTIC TECHNOLOGY (PD-PT) with 74.37%
From Central Institute of Plastic Engineering &Technology
(CIPET, Aurangabad, M.H.) 2007-2011.
HSC Vasantrao Naik Collage, Aurangabad. FEB-2007 2nd
SSC Z.P. High School, Lohgaon MAR-2005 1st

Skill Sets

Can operate MS office, MS world Etc.
SAP

Project Work Done
Minor Project: - Plastics Used In Sports.
Major Project: - All Electrical Injection Moulding Machines.
Industrial Project: - TPM & KAIZEN

Work Experience

Executive Production
From -14th December 2019 to till date
Company profile - Leading BOPP Films, Flexible Packaging Films manufacturers

Job profile -
Production control for 5 layer BOPP line (Biaxially Oriented PolyPropylene).
Handling team of 20 engineers and trainee.
Day to day planning for shift hours and crosscheck the parameters for production.
Fill the checklist ensure that the production process is in line with the previous shift.
Planning of raw material and manpower according to daily output.
Follow-up with QC specification and taking care special requirement from client.
Plan the shutdown with maintenance team for any troubleshooting problems.
Inter disciplinary coordination for smooth operations.
Ensuring final product quality meets the specified production standards.
Ensuring safety standards as per norms.
Preparation of details shift report and handover to incoming shift in-charge.
Keep track of the daily, monthly, yearly targets.
Quality check of Reprocessed Plastic Granules(RPG).

Office
From -16th August 2011 to 6th July 2018
Company profile - a leading manufacturer of tacky & protective films for primary & secondary packaging. Produce industrial wrap films, food wrap film, and surface Protective

Job profile -
Responsible for planning, monitoring and directing the conduct of operation and work activities
of the production department in relation to the manufacturing and processing.
Planning of raw material & packaging material day to day.
Taking Input & Output stock.
Grasp new methods, tools for improving the quality and productivity of the organization.
To ensure that the house keeping area is under control.
Inward material inspection received from the supplier.
Materials of quality and quantity consistent with the approved company’s requirements and
standards.
Preparation on production lines plan, make necessary arrangements for Manpower, material as
calculation needed for production.
Cross Checking of Film quality.
Material handling & Quality checking of input material.
Coordination with maintenance team.
Shop floor management.
13. Material dispatch.
14. PPC official work like Preparation of shift schedules, PR for new customers.
15. Customer complaints handling
films

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com