Ref. No. : CA - 17834 - (Production - Moulding – with 13.6 years in Plastic Industry)

Education

Post-Graduate Diploma in Plastics Processing & testing  From CIPET Mysore in 2011 to 2012

 B.Sc. Chemistry from C.S.J.M. University  Kanpur (U.P.) in 2010

H.S.C From UP Board in 2007

S.S.C From UP Board in 2005

Skill Sets

4 years 5 month of dynamic experience in the field of Automobile Industries which includes Production & Process setup of Plastics parts.
In Process &Production Engineering having 4years 5month of hands on experience
• Specialized in Production, Rejection reduction & Process setup,
• Good Knowledge in Shop floor handling,
• Specialized in Manpower handling & Material Handling for injection molding,
• Good knowledge Process setup
• New comer training,
• Playing important role in plan making for production,


Specialized in Production, Rejection reduction & Process setup,
Good Knowledge in Shop floor handling,
Specialized in Manpower handling & Material Handling for injection molding,
Good knowledge Process setup
New comer training,
Playing important role in plan making for production,

Work Experience

Shift Engineer
Since Jan 2015
Company Profile: Manufacturer of pipes and fittings

Assist Engineer
Aug 2011 to Jan 2015
Company Profile: Manufacturer of plastics automotive components

ob Profile: 
Shop floor handling, Manpower handling, Material handling, Production planning, Part moment, Online assembly, DIS closing, SMP revised, Problem solving with Audit Document Cycle time reduction, increase Efficiency & Utilization
Also having knowledge of production of UPVC pipes & fittings (Injection molding process).
MACHINE & TOOLS HANDLING:-Injection Molding Machine Hydraulic & All Electric up to 1350 Tons (JSW, cincinnati Milacron, kraussmaffei ,L&T,arburg,battenfeld,Windsor& others), MTC, Chiller, robot, Single and multi-cavities(up to 16 cavities) moulds.
New comer training, 5S & Kaizen activities for continual improvement.
Assembly Feasibility.
Process set up for new mould & process monitoring.

Support:  
Support  to Maintenance, Tooling, Planning & Quality Development team:
Supporting during PM, and analysis the problem,
Define tooling problem,
During plan making playing a big role for PPC team,
Part running as per required Quality standard.

Project handled:
Handled B299, B517ICA, B515,B299 for FORD & 613T/P for Ashok Leyland mould trail.
Increase of Productivity & reduction of part weight in scientific molding
Reduction of Mould change time using Quick mould change system.
Implementation of one man 2machines concept.
Standardization of Mould & machine for its auxiliary equipments (Locating Ring & Cooling nipples).
Reduction of mould change over time by allocating Specific machine for specific products.
To identify the root cause of problem solving method

Academic Project:
Client : CIPET Mysore
Team size : 1Year, 6 Months.
In In-plant Training I had made a project report on Rejection Reduction of Mould For Lift Gate Part and
Front Grill Bumper Part.

Future Goals

To be associated with a professional organization contributing myself to the Production Process, & Technological excellence of the company through long term mutual relationship

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com