Post-Graduate Diploma in Plastics Processing & testing From CIPET Mysore in 2011 to 2012
B.Sc. Chemistry from C.S.J.M. University Kanpur (U.P.) in 2010
H.S.C From UP Board in 2007
S.S.C From UP Board in 2005
4 years 5 month of dynamic experience in the field of Automobile Industries which includes Production & Process setup of Plastics parts.
In Process &Production Engineering having 4years 5month of hands on experience
• Specialized in Production, Rejection reduction & Process setup,
• Good Knowledge in Shop floor handling,
• Specialized in Manpower handling & Material Handling for injection molding,
• Good knowledge Process setup
• New comer training,
• Playing important role in plan making for production,
Specialized in Production, Rejection reduction & Process setup,
Good Knowledge in Shop floor handling,
Specialized in Manpower handling & Material Handling for injection molding,
Good knowledge Process setup
New comer training,
Playing important role in plan making for production,
Shift Engineer
Since Jan 2015
Company Profile: Manufacturer of pipes and fittings
Assist Engineer
Aug 2011 to Jan 2015
Company Profile: Manufacturer of plastics automotive components
ob Profile:
Shop floor handling, Manpower handling, Material handling, Production planning, Part moment, Online assembly, DIS closing, SMP revised, Problem solving with Audit Document Cycle time reduction, increase Efficiency & Utilization
Also having knowledge of production of UPVC pipes & fittings (Injection molding process).
MACHINE & TOOLS HANDLING:-Injection Molding Machine Hydraulic & All Electric up to 1350 Tons (JSW, cincinnati Milacron, kraussmaffei ,L&T,arburg,battenfeld,Windsor& others), MTC, Chiller, robot, Single and multi-cavities(up to 16 cavities) moulds.
New comer training, 5S & Kaizen activities for continual improvement.
Assembly Feasibility.
Process set up for new mould & process monitoring.
Support:
Support to Maintenance, Tooling, Planning & Quality Development team:
Supporting during PM, and analysis the problem,
Define tooling problem,
During plan making playing a big role for PPC team,
Part running as per required Quality standard.
Project handled:
Handled B299, B517ICA, B515,B299 for FORD & 613T/P for Ashok Leyland mould trail.
Increase of Productivity & reduction of part weight in scientific molding
Reduction of Mould change time using Quick mould change system.
Implementation of one man 2machines concept.
Standardization of Mould & machine for its auxiliary equipments (Locating Ring & Cooling nipples).
Reduction of mould change over time by allocating Specific machine for specific products.
To identify the root cause of problem solving method
Academic Project:
Client : CIPET Mysore
Team size : 1Year, 6 Months.
In In-plant Training I had made a project report on Rejection Reduction of Mould For Lift Gate Part and
Front Grill Bumper Part.
To be associated with a professional organization contributing myself to the Production Process, & Technological excellence of the company through long term mutual relationship
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com