plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/1/2025 6:01:04 PM ________________________________________________________________________________________ RefNo: CA - 17834 Gender: Male Age: 35 Designation: Engineer Highest Education Level: Post Graduate Diploma Current Gross Salary: 240000 240000 /Annum Expected Gross Salary: 300000 300000 /Annum Notice Period: 1 Days Education Details: Post-Graduate Diploma in Plastics Processing & testing ?From CIPET Mysore in 2011 to 2012 ?B.Sc. Chemistry from C.S.J.M. University ?Kanpur (U.P.) in 2010 H.S.C From UP Board in 2007 S.S.C From?UP Board in 2005 Skill Sets: 4 years 5 month of dynamic experience in the field of Automobile Industries which includes Production & Process setup of Plastics parts. In Process &Production Engineering having 4years 5month of hands on experience ? Specialized in Production, Rejection reduction & Process setup, ? Good Knowledge in Shop floor handling, ? Specialized in Manpower handling & Material Handling for injection molding, ? Good knowledge Process setup ? New comer training, ? Playing important role in plan making for production, Specialized in Production, Rejection reduction & Process setup, Good Knowledge in Shop floor handling, Specialized in Manpower handling & Material Handling for injection molding, Good knowledge Process setup New comer training, Playing important role in plan making for production, Work Experience: 13.7 Work Experience Details: Shift Engineer Since Jan 2015 Company Profile: Manufacturer of pipes and fittings Assist Engineer Aug 2011 to Jan 2015 Company Profile: Manufacturer of plastics automotive components ob Profile:? Shop floor handling, Manpower handling, Material handling, Production planning, Part moment, Online assembly, DIS closing, SMP revised, Problem solving with Audit Document Cycle time reduction, increase Efficiency & Utilization Also having knowledge of production of UPVC pipes & fittings (Injection molding process). MACHINE & TOOLS HANDLING:-Injection Molding Machine Hydraulic & All Electric up to 1350 Tons (JSW, cincinnati Milacron, kraussmaffei ,L&T,arburg,battenfeld,Windsor& others), MTC, Chiller, robot, Single and multi-cavities(up to 16 cavities) moulds. New comer training, 5S & Kaizen activities for continual improvement. Assembly Feasibility. Process set up for new mould & process monitoring. Support: ? Support ?to Maintenance, Tooling, Planning & Quality Development team: Supporting during PM, and analysis the problem, Define tooling problem, During plan making playing a big role for PPC team, Part running as per required Quality standard. Project handled: Handled B299, B517ICA, B515,B299 for FORD & 613T/P for Ashok Leyland mould trail. Increase of Productivity & reduction of part weight in scientific molding Reduction of Mould change time using Quick mould change system. Implementation of one man 2machines concept. Standardization of Mould & machine for its auxiliary equipments (Locating Ring & Cooling nipples). Reduction of mould change over time by allocating Specific machine for specific products. To identify the root cause of problem solving method Academic Project: Client : CIPET Mysore Team size?: 1Year, 6 Months. In In-plant Training I had made a project report on Rejection Reduction of Mould For?Lift Gate Part and Front Grill Bumper Part. Future Goals: To be associated with a professional organization contributing myself to the Production Process, & Technological excellence of the company through long term mutual relationship ________________________________________________________________________________________