MBA(OPRATION MANAGEMENT, MARKETING MANAGEMENT) Dr. AKTU LUCKNOW BIBM AYODHYA 2021 FIRST DIVISION
PGD-PPT CIPET LUCKNOW CIPET LUCKNOW 2018 FIRST DIVISION
B.Sc Dr. RMLAU FAIZABAD S.S.M.V. AYODHYA 2015
12th UP BOARD ALLAHABAD NIC NAUTANWA 2012 SECOND DIVISION
10th UP BOARD ALLAHABAD MBIC BUDDHA NAGAR ADD BZR MAHARAJGANJ 2010 SECOND DIVISION
SAP ERP. - Production planning.
MS OFFICE. - Production report and power presentation .
INTERNET SURFING. - Email, chrome browser, social media.
Sr. Executive production.
From -15 June 2022 to till now
Comapny profile -Leading th plastic profiles /Extrusion process industries.
Production Engineer.
From -07June 2021 to 14june 2022.
Company profile - PVC PIPE DIVISION, (EXTRUSION PROCESS) ATSM PIPE, CAUSING PIPE,CPVC PIPE, AGRICULTURE PIPE,SWR PIPE.
Associate (Production)
13 July 2017 To 05 May 2021
Hil Limited Ck Birla Group Company.
Job profile -
Plan manage,and oversee all element of production, shift handling.
Assess and analyse current production method.
Develop and draft on improved production process.
Design and implement cost- reduction change.
Maximum production of machinery and workers.
Responsible for making daily production plan according to customer requirement and meeting daily production.
Preparing and implementing action plan effectively to maximize OEE of production related machines.
Analyzed work flow and planned and scheduled costumer order base on the material availablity, machine capacity and canstraint.
Waste reduction and proper material wastage deduction responsibility with improved quality of the product.
Responsible for Extrusion machine and executing production related tasks in the planning control and travel shooting.
Planning-to-day strategies, production schedules with resource allocation and machine loading for optimum output.
Implementation of 5s,kaizen and continues improvement related to cost, quality, moral, safety and related process.
Compounding process, grinding process gap analysis on the basis of production targets Vs achieved.
Wastage analysis& reduction.
Checking and setting Machine Parameters for Wall Thickness, OD & ID check, Length, Weight.
To the optimize the productivity by various methods :- continual improvement optimum utilisation of all the recourse 4M (Man, Machine, Material and Method).
Provide training to manpower for new machines oprations.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com