B.e. In Mechatronics With (67.24%) In Class-distinction: Year 2003 From Shri U. V. Patel College Of
Engineering, Gujarat, India (Hemchandracharya North Gujarat University)
Hsc Science From G.s.e.b With 60.15 % In Year Of 1999.
Ssc From G.s.e.b With 76.29 % In Year Of 1997.
Certified Internal Auditor For Iso-50001 Enms (Energy Management System) - 2011 By Bureau Veritas.
Sap (Pm & Mm Modules) | Autocad | Iot 4.0 Implementation | Robotics & Automation
Iso/iatf 16949 | Tpm, Tqm, 5s, Lean Manufacturing | Energy Audits
Capital Equipment Fat & Vendor Development | Risk Assessment & Compliance
Senior Team Leader Projects & Maintenance
From :- Oct 2024 Mar 2025
Company Profile :- Provider Of Independent Conformity Assessment Services
Job Profile :-
Led Facility And Plant Maintenance For Mk-series Aerial Bomb Production, Including Cnc Machining, Cold Forging, Paint Shop, Phosphating, And Heat Treatment.
Managed A $110m Project Spanning 26,000 Sqm, From Construction To Operational Ramp-up.
Lead Contract Manufacturing
From :- Jan 2024 Mar 2024
Company Profile :- The Architects Of Seamless Supply Chains, The Navigators Of Global Trade,
Developed And Executed A Contract Manufacturing Strategy, Including Setting Up Ashok Leyland Bus Chassis Fabrication.
Sr. Manager Projects & Maintenance
From :- Feb 2023 Dec 2023
Company Profile :- Manufacturer And Supplier Of Cpvc, Upvc, Swr Plumbing
Job Profile :-
Led Greenfield/brownfield Mepf Projects Across 7 Extrusion & Injection Molding Plants.
Achieved 7.2m Savings Through Design Optimization While Maintaining Quality Standards.
Reduced Installation Time By 3 Months And Optimized 12,000 Sqft Of Factory Space.
Manager
From :- Jan 2020 Feb 2023
Company Profile :- Finolex Industries Ltd.
Job Profile :-
Spearheaded Multiple Automation And Robotics Projects, Including Iot 4.0 Implementation For Pipe Extrusion And Injection Molding.
Designed And Implemented Automated Ball Valve Assembly And Air Leak Testing Systems.
Manager
From :- Dec 2019 Jan 2020
Company Profile :- Ready Roti India Pvt. Ltd,
Managed Fire Hydrant Network And Plant Mepf Upgrades.
Own Startup
From :- Aug 2019 Dec 2019
Company Profile :- Solar Product
Developed, Procured, And Marketed Solar-powered Led Lighting Products.
Manager
From :- Jun 2019 Aug 2019
Company Profile :- Polyplastics Industries (I) Pvt. Ltd,
Led Mep Project Design Reviews And Plant Facility Execution.
Manager
From :- Nov 2016 May 2019
Company Profile :- Varroc Engineering Ltd
Job Profile :-
Executed 03 Greenfield Projects (90 Cr Overall Spend).
Established Maintenance Departments, Achieving 98% Plant Uptime.
Manager
From :- Nov 2009 Nov 2016
Company Profile :- Tata Motors Ltd.
Job Profile :-
Led The Maintenance Team For The Vehicle Assembly Shop, Ensuring Uptime Above 95% For 8 Years.
Reduced Power Consumption From 67 Kwh/car To 35 Kwh/car And Optimized Vcc Costs.
Manager
From :- May 2008 Oct 2009
Company Profile :- Tata Motors Ltd
Job Profile :-
Led Facility Setup For Manufacturing Tatas New Launch Worldtruck.
Planned Chassis-frame & Trim Line Shop Layout, Selected Machinery, Processed Purchase Orders, And Managed Structural Installations.
Supervised Equipment Mounting, Installation, Commissioning, And Maintenance Schedule Planning.
Led The Installation & Commissioning Of Prima Chassis Assembly And Cab Trim Assembly Shop, Including:
Slat & Power & Free Conveyors
Diesel Filling Project (Pipeline From Diesel Shed To Assembly Line, Main Diesel Tank Setup)
Windshield Glass Glazing Robot (Fanuc Make)
Rapid Doors, Fifo Racks
Implemented Various Engineering Solutions To Increase Equipment Availability.
Deputy Manager - Maintenance
From :- Nov 2009 Nov 2016
Company Profile :- Ashok Leyland Ltd
Job Profile :-
Served As Plant Engagement Manager (Pem) Responsible For Gemba Activities.
Implemented Small Group Activities To Encourage System Improvements.
Conducted Overall Equipment Effectiveness (Oee) Analysis, Set Targets, And Established Baselines.
Developed And Analyzed Mtbf & Mttr Charts To Implement Zero Downtime Concepts.
Established A Breakdown & Material Shortage Indication System (Foremen Indication System) To Minimize Downtime.
Led Installation & Commissioning Of Truck Chassis Assembly Shop Equipment.
Engineer - Automation & Controls
From :- Jul 2006 Feb 2007
Company Profile :- Videocon Industries Ltd
Job Profile :-
Hands-on Experience In Automation And Control Systems, Plc Programming, And Maintenance.
Plc: Allen-bradley Micrologix-1200
Drives: Allen-bradley Powerflex-4, 40, 70
Robots: Kuka-s34 & S24
Engineer - Maintenance & Tpm Implementation
From :- Mar 2005 Jun 2006
Company Profile :- Batliboi Ltd
Job Profile :-
Developed And Introduced A Tpm-based Maintenance Approach.
Created Plans, Programs, And Strategies For Equipment Improvement.
Assessed Machine Capacity For In-house Manufacturing Or Subcontracting.
Managed Cnc Programming, Especially On Turret Punch Machines.
Engineer - Maintenance & Iso Documentation
From :- June 2003 Feb 2005
Company Profile :- Pharmalab Engineering (I) Pvt. Ltd.
Job Profile :-
Managed Iso Documentation For Plant Operations.
Maintained Nc Bending & Shearing Machines.
Senior Management Professional Offering Over 21+ Years Of Strong, Decisive Making With Proven Abilities To Handle Project’s
Planning – Civil + Utility + Mepf, Installation & Commissioning, Indirect Purchase & Plant & Utility Maintenance. Expertise
Executing Projects From Concept To Production Ramp Up. Conversant With Lean Techniques Like 5s, Tpm, Tqm And Du-pont Safety
Standards. Well Conversant With Iso-iatf Standards. Able To Do Multi-tasking With Strong Time & Team Management.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com