Achieved a good standard of education throughout the curriculum including GGCSE Mathematics. 1979 - 1984 Westfield Comprehensive
Strong managerial and team building skills
Able to work with hand tools and make operational adjustments to equipment.
Excellent mechanical aptitude and strong math skills.
Accurate and reliable under pressure
Full clean drivers licence
IRPC trained
Computer skills, such as typing, MS Word, and MS Excel.
Fork Lift Truck Counterbalance Licence.
Able to communicate effectively with customers.
Plant / Production Manager
Since 2010
Company Profile: Leading manufacturer of uPVC products for the Construction sector
Job Profile:
Production planning
Setting up of new extrusion lines.
Quality assurance
Trials and commissioning of new tooling
Customer orders & complaints
Staff welfare
Health and Safety
Shift planning and changes
Training staff
Interviews, Redundancies & Dismissals
Maintaining petty cash box for Factory
Sourcing & Purchasing new machinery and tooling
Sourcing & purchasing materials
Plant Supervisor
2008 - 2010
Company Profile: Leading manufacturer of uPVC windows, doors and glass units
Job Profile:
Ran the Recycling Department – From window off cuts to pulverized finished materials.
Set up the Extrusion Department – 2 Extrusion Lines were set up, one of which was running co-ex gasket in twin bead die. The other ran ancillaries for the window industry.
Shift Supervisor
2008
Naylor Drainage, Barnsley, England
Job Profile:
Machines and operators
Shift changes
Quality assurance
Completing Production sheets, etc.
Fulfilling Order Requirements
Controlling the production of corrugated pipe (HDPE
Plant/Production Manager
2008
Eagley Plastics Limited, - Manufacturer of rigid PVC products such as, Conduit, Trunking, Ducting, etc.
Job Profile:
Responsible for all activities within the company including:
Staffing
Quality assurance
Logistics
Production planning
Customer orders and complaints
Trials and commissioning of new tooling.
Plant / Production Manager
2003 - 2007
PVC Group SA (Pty) Ltd, Gauteng, South Africa. Manufactured rigid PVC products such as, Conduit, Trunking, Ducting, etc.
Job Profile:
Production planning.
Quality assurance
Logistics
Health and Safety
Staff welfare
Trials and commissioning of new tooling
Customer orders
Complaints
Building of good relationships across all customer base
Setting up new Extrusion Lines
Production Manager
1991 - 2002
Eagley Plastics Limited, Derbyshire, England
Originally employed as a shop floor operative on extrusion machines consisting of packing and quality checks.
Progressed to setter of extrusion machines ranging from flexible to rigid PVC, HDPE, ABS.
Promoted to Team Leader supervising a shift of 11.Planned machine changeovers, designated work force to machines in order to achieve optimum production time.
Promoted to production manager in charge of all extrusion within the company, including all manning levels, disciplinary actions, organising shifts, liaising with Team Leaders and communicated at all levels from operator to Managing Director.
Pneumatic and Hydraulic Tester
1989 - 1991
Pick Up Bellows
Primary testing of welded joints to comply with national safety standards.
Bridge Waterproofer
1987 - 1989
Stirling Lloyd
Strip prefabricated bridges to apply waterproofing to increase structural stability.
Machine Operator
1984 - 1987
Bramhall Woodware
Cutting and machining wood in the manufacture of sink tops.
I would like to maintain a Management position within the PVC Extrusion industry in a secure company.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com