Ref. No. : CA - 5267 - (Production - Moulding – with 28.5 years in Plastic Industry)

Education

Pursuing M.B.A. from ICFAI University .
Post Graduate Diploma in Plastic Processing Technology from CIPET, Bhopal in the year 1996.
B.Sc(PCM)} from Govt. Auto. Science College JABALPUR under Rani Durgawati University, Jabalpur.

Skill Sets

Production & Maintenance of Injection Moulding

Work Experience

Senior Engineer
21thJune 2002 to till date
Company Profile: Leading CD manufacturing organization. Basically company involved in data storage device like Floppy, CD, DVD. Company has subdivision like CDR, DVD & Jewel Box Production unit. Jewel Box is an ISO 9001-2000 division. They have 46 injection molding machine involve in mass production of 5.4 mm jewel box, slim box 10.4 mm regular jewel box, CD Cake Box other packaging production.
Job Profile
Responsible for all activity in production shop during shift.
Responsible for manpower utilization.
Responsible for providing Training & Education whenever necessary.
Responsible member of T.P.M. team.
Responsible for maintaining PPM level during shift.
Responsible for process improvement.
Responsible for trails - cost reduction & new molds.
T.P.M. documentation- data collection, why-why analyses, one point lesson.
Responsible for Implementation of kaizen activity (1 kaizen / month / person).
Responsible for generating P.R.R.(Problem , Reporting , Resolution ).
Responsible for maintaining 5S in plant working & good Ergonomics.

Senior Engineer
12th June 2000 to 15th June 2002.
Worked with Telemecanique & Controls (I) Ltd. (TC) Noida
Company Profile :
An ISO 9001 2000 Company engaged in manufacturing of Contactor, Relay, Timer & Motor Starter which are exported to Asian & European Market. It is equipped with Moulding shop, Tool room, Press shop & Brazing shop. In Moulding shop 30 T to 180 T capacities of Injection moulding, machine (thermoplastic & thermo set) & compression moulding machine.
Job Profiles
Responsible for all activity comprising in moulding shop.
Responsible for maximum utilization of moulding machines.
Responsible for spare part.
Responsible for proper utilization and processing of plastic raw material like Nylon-6, Nylon-6 (GF), Nylon-66, Nylon-66 (GF) Poly carbonate, Backelite & Dough moulding compound.
Responsible for trail of new moulds and raw materials.
Responsible for ISO 9001-2000 documentation, Process sheet and Tool history card.
Responsible for monthly reconciliation of material lying in moulding shop.

Shift In charge
Aug. 96 to 30th May, 2000
Worked in Evershine Moulder Ltd.
Company Profile:
Evershine Moulder Ltd. is one of the Evershine Moulders Group Company. It is mainly an injection moulding plant which have 13 PLC Injection moulding machine of CLF Taiwan, Asian Plastic, Taiwan & LG Korea. The machine has Robot control for component ejection.
Job Profile:
Responsible for all the activity during production of component in shift.
Responsible for status of mold & spare used in shift.
Preventive maintenance of injection moulding machine.
Responsible for robot setting and material Conveying System.


Future Goals

To be Leader in Injection Moulding Processing & Trouble Shooting & Optimized Plant O.E.E. Through Proper Utilization of Man, Machine, Mould, Material & Other Resources

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com