Diploma in Mechnical Engineering from Bombay University.
Computer Knowledge: M.S.OFFICE, AUTO CAD.
Cost reduction in assembly line.
Implemented scrap disposal system.
Senior Engineer
March 2005 to till date
Presently working with a leading company a: TS 16949 certified organization manufacturing wide range of automobile switches. Major customers are TATA MOTORS, ASHOK LEYLAND, PIAGGIO, M&M, KBX, BEHAR INDIA, TYCO, EICHER MOTORS, JCB, FORCE MOTORS, TVS MOTORS.
Job Profile:
To study component drawing to determine manufacturing operations & their sequence.
Handling m/c shop activities such as tooling jigs fixtures & material movement.
Trouble shotting of problems in production.
Co ordinate with Engineers regarding bill of material, Raw material calculation, material decision. Co ordinating the activities of various dept. to achieve regular flow of production. To coordinate with marketing dept. for confirmation of production orders & delivery dates.
Plan approve supplier delivery schedule.
To keep information about status of manufacturing components.
Inventory checking of inprocess items & maintaining WIP.
Progress & follow up of manufacturing items with shop floor, In house tool room & suppliers.
To prepare m/c load charts to know the work load on each m/c.
Giving technical support to the supplier.
Ensure availability of parts as per drawing & bill of material.
To design & manufacture jigs & fixtures for better productivity.
Exposure to lean manufacturing process.
Exposure to auto Feeders & progressive tooling.
Shift scheduleing & m/c loading to take corrective action to minimize rejection.
Senior Engineer
July 1999 to March 2005
Worked with Dhariwal Electrical Unit 1 (A DIVISION OF DHARIWAL INDUSTRIES LTD.)
Company Profile:
A fast growing & engauged in manufacturing of house hold electrical accessories having annual turn over of Rs 30 Cr. Products of the company are electrical accessories such as switches sockets ,modular plates ,fuse indicators & electronic fan regulators etc.
Job Profile:
Looking after assembly line containing low cost automation fixtures.
Trouble shooting of problems on line.
Debugging fixtures & SPM on line.
Arranging line in sequential operation to reduce material movement.
Calculating operation time for each station by work samplng method & stop watch.
Making arrangement of bins for keeping raw material & assembled material properly to avoid cross hand movement & saving working space.
Productivity improvements by changing work place lay out or automation.
Designing primary testing fixtures for above products on assembly line
Plastic moulded components inspection as per drawing.
Assembly of electrical products using following machines & other accessories such as conveyer belt, Pneumatic screw driver, Ultrosonic welding machines (capacity 1.2 watt) using for joining of plastic components as per requirements.
Man power handling & achieve the production target within time limit.