B.E-Mechanical Engg (63) May2007 (First Class) Govt College of Engineering at Tirunelveli.
Diploma in Mechanical Engg (75.16). April1996 (first class with honours)
St.Xaviers Polytechnic College at Tuticurin.
SSLC (75.14) March1993 St.Johns hr.sec.school, Tirunelveli-2
Computer Knowledge
Auto cad-2000,
PRO-E,
CATIA
ANSYS CFX Certified courses
Team work
Pro-activeness
Able to handle multiple projects at a time
Good interpersonal and communication skills
Committed to new developments and initiatives
Motivating people towards goal
Optimal utilization of manpower and their skills
Engineer Production (Pressure Die Casting)
Aug 2003 to till date
Company Profile : ISO 9001-2000 Certified and TS 16949 on going company. Supplied to JKM Derim automotive Ltd., Rane TRW Ltd., Borgwarner Ltd., Scheftenacker Motherson Ltd.
Job Profile
Monitoring machine loading plan based on customer schedule.
Cycle time estimation
Monitoring production output and delivery status
Optimization of man and machine time
Elimination of non value added operation in manufacturing
Implementation of cellular manufacturing
Improving productivity by line Balancing, Operator reduction
Having Knowledge in Die Presetting & set up time, DIE change over time reduction
Implementing corrective actions for various on going quality issues like machine capability and process capability improvements
Educating on job and off job training for operations
Implementing corrective actions ( POKA YOKE, KAIZENS) for customer complaints and In house complaints
Supporting for ISO/ TS 16949 Document preparation and maintaining records
Implementing the 5S & 3C activities
Production Supervisor
March 2000 to March 2003
Worked with Antony Plastic Industry, Tirunelveli
Company Profile
Manufacturing of Electrical Goods and Commercial Home Appliances by Injection Moulding
Production Supervisor
June 1997 to Feb 2000
Worked with Sri Sesha sai Auto Components Pvt Ltd, Chennai.
Supervisor
June 1996 to Apr 1997
Worked with Sree Priya Auto (LML VESPA Dealer), Tirunelveli.
Job Profile
Arrangement of work schedule and preparation of raw material
Carefully watching action of production.
All types of pressure has been verify frequently in the equipment like pump pressure, Intensive pressure, Accumulator pressure and N2 pressure.
Highly attention in furnace temperature.
All the periodic preventive and breakdown maintenance carried out in pressure die casting machine.
Checking Quality of the production and finding the root cause of defective materials
Maintaining Die maintatence record , ( DIE Requisition record)
8 Maintaining First Off and Last Off Record
To develop proven ability and expertise in production. Engineering using modern tools & technique and make a successful career in the fast growing sector.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com