Ref. No. : CA - 26412 - (Production - Extrusion – with 12.4 years in Plastic Industry)

Education

B.Tech From Rit Roorkee, Dehradun in 2012 with 70%

12th From A.N.Jha Inter College Rudrapur U.K, U.K State Board, with 50.12%

10th From Bharat Inter College Bareilly U.P, U.P State board, with 52.55%

Skill Sets

HDPE extrusion machines handling and production planning and control working.

Work Experience

Production Engineer Power Cables and Coaxial Dept
Since Feb 2014
Company Profile: Manufacturer of cables by HDPE and extrusion process.
Job Profile:
Production Planning and Control Works at SAP Software. Prepare daily production Report and manpower.
Planning of plant capacity for future production program. HDPE Extrusion Process.
Maintaining Sufficient Inventories to support and continuous flow of production.
Insulation Cables Production with Wire Drawing Nextrom Extrusion machines and Davies System (DS).
Extrusion Process use for Co Axial Cables and Light Duty Cables and Telecom Cables.
Wire Drawing, Insulation, Braiding Machine, Sheathing Line.
Use (HDPE) Materials for Insulation (Co-Axial) Cables, PVC and Master Batch Use for Power Cables.
Light Duty Cables Manufacturing (L.D.C), Sheathing Line (Extruders).
Arrange Man Power for Maximum Production. W.I.P. Work Collect stocks end of month.

Production Team Leader
Oct 2012 to Feb 2014
Company Profile: Is an Automobile company and assembling heavy trucks vehicles.
Job Profile:
An analysis of the article to determine what to make and what to buy.
Design Engineer with good knowledge in Solid works / AutoCAD.
Assembly drawing creation, Bill of material creation.
To determine the quality and type of material.
Determining the manufacturing operations and their sequence.
Generate Part & Assembly 3D Models & Drawings, BOM and other project related documents.
A determination of lot sizes, Scheduling of Job Order Manufacturing.
Perform 3D Design in the required CAD platform (SolidWorks/Inventor/Creo) as assigned.
Determination of scrap factors, Production Planning Routing and Scheduling.
production controller directly reports to the works manager.
Arrange Man power at shop Flour and manage Shift Schedule.
Inspection Material and Assembly of the heavy bicycle at assembly Production Lines.
Check Vendor Material and Supplier Parts Problems.
Washer Expend and Flinch not alignment chesses or Assembling Problem.

Industrial Training
Organization: N.H.P.C. Tanakpur Banbasa.
Designation: Trainee
Period : June 2011 to July 2011
Explanation : The Study of Heavy Turbines and Its Working Phenomenon.
Practically Views and Understanding its Mechanics. Working of Different Types of Turbines
Find the Head of Turbine and Discharge of water.
Work Phenomenon and Power Generation.
Study for Horizontal and Vertically Turbines.

Projects - Hydro Power Plant
Position - Team Leader
AIM- Development of Power by Arrangement of Turbines by Used of Waste Water.
Generated Power forHuman Life.
Save Power and Use Waste Water.
Easy way to Use waste water and Developed Turbine arrangement System.
Safe Environment pollution and saved power.
Reduce the Water Pollution.

Future Goals

To acquire a challenging position which fully utilizes my ability and knowledge, To provide my best service to the organization with my efforts and skills.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com