Ref. No. : CA - 35093 - (Quality – with 9.3 years in Plastic Industry)

Education

B.E (Electronics Engineering), 2013
S B Jain Institute of Research and Technology , Nagpur 67.84%
XII, 2008
Mahatma Fule Mahavidyalay Warud 68.0%
X, 2006
N T R High School Warud, 70.60%

Skill Sets

Knowledge of basic 7 QC tools.
Knowledge of Six-Sigma tools for DMAIC approach.
Basic awareness of 5S,3R,3F,7 Waste & WCM
Best application of Poka-yoke,, Kaizen implementation
Basic knowledge of ISO 9001:2008,ISO 9001:2015

Work Experience

Senior Engineer
From -Jan 19 to till date
Company profile -Manufacturing including Engineering Design, Tool Development, Plastic injection, Pad printing,

Job profile -
Supplier Quality Monitoring
Taking care of Vendor Quality & Incoming Material Quality
Raising Non Conformance(NCR) to Suppliers & closure of NCR
Incoming rejection analysis & contributing to supplier to find Root cause
Making Counter measure with Root cause,Temporary,Parmanent,Disposal,Corrective & Preventive action(CAPA)
Issuing notice of warning letter & penalty to Supplier MD for repeated Quality issues
Raising claim to imported suppliers for NC parts/material for Q-issues & future Quality improvements
Incoming Material Inspection
Inspection & testing of incoming parts quality before taking into process as per PITS,ICP,Drawings
Analyzing incoming Lot Rejection Rate(LRR) for quality improvements
Strengthening incoming inspection process by reflecting LQC/OQC/Field issues
Provide technical guidance to Quality technicians & Inspectors
Preparing inspection guides for incoming part inspection
Line Issues Monitoring
Analyzing Part Return Rate(PRR) & Total Line Defect Rate(TLDR) related to part quality for improvements
Resolving line issues to prevent line stoppage regarding part quality
Conducting OS&D meetings on line for making decisions on part defect
Supplier Audits & Evaluation
Responsible for conducting SQ Gate(Supplier Quality) audits
Monitoring supplier quality performance & evaluation
Q-System and process audits of suppliers(Localization,Change of supplier,New suppliers)
Development Activities
Responsible for First Part Approval (FPA) & E-FPA process
Facilitating New product development initiative with key focus on Quality, Cost & Delivery
Q-support (Q-System,QCFC verification,Making Jigs & Fixtures) to develop new suppliers
IQC Management activities
Man power handling & work load calculation to ensure productivity
Instrument Calibration scheduling,auditing and maintenance on monthly basis
Quality meeting planning and MOM preparation

Executive
From - August 17 to Jan19
Company profile -manufacturer, supplier, exporter of Tractor Parts

Job profile -
Inhouse Process Monitoring
Ensure regular monitoring of process and quality control at each stage of manufacturing activity
Responsible for conducting process Time checks, Pick up audit & FPI activities
Directed co-ordination and follow-ups for internal process audits
Part wise defect analysis using 7 QC tools
To creates and updates Master files of check lists for internal and external controls
Part Quality Improvement activities
Action for Inhouse improvement against the defects occur during process
Analyzing rework & rejection trend and initiate to take corrective & preventive action
Monitor and maintain in-house DPMO
Development Activities
Responsible for Production Part Sample Approval (PPA) process
Preparing check sheets for new developed part & running change
Develop or specify standards, methods or parameters as per QAP/SOP to determine product quality.
Inspection and Testing
Inspection & testing of incoming part,material,RM
Inspection & testing of inhouse FG part Evaporator,Condenser,Painted,Unpainted parts,Copper parts etc
Performing and responsible for following tests
Inspection for Incoming parts: Dimension check, Visual check (Rust, white products, dents, warpage, unplated area), Ductility test, Impact test, Bend test, Salt spray test (Corrosion resistance test), Destructive test for spot weld & projection welding.
Paint Shop Test :DFT Test, Cross cut test, Viscosity test. Test on GP sheet panel Impact test, Bend test, Adheshion test and DFT test Welding:-Fillet weld(Tee joint) ,Groove weld(Butt joint) etc

Executive
Jan 2015 TO June17
Prothom Industries India Private Limited

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com