Post Graduate Diploma In Plastic Processing & Testing From Central Institute Of Plastics Engineering & Technology
Bachelor in Science from Utkal University. (Orissa)
Responsible for Planning, Co-ordination and Control of Production Processes.
Implementation of weekly/monthly production plan.
Identifies Maintenance works Suitable for Contracting out and Prepares Detailed Specifications and work scope consequently.
Participates in Preparation of Annual Maintenance Budgets, Monitors Maintenance Expenditure and Annual Maintenance Budgets,
Prepares Periodic cost Performance and Management Reports with Indices.
Experience in Maintenance Planning, cost Control and Contract Management, Preferably in Plastics Industry.
Experience in Mould maintenance, Hot Runner Mould Maintenance, Mould Design & Development.
Experience in Atomization of Any Process In Order to Improve the Productivity & Reducing Various Costs.
Experiences About Both SINGLE AND TWIN SCREW CO-ROTATE Paletizer.
Computer Skills: Well versed in Microsoft office, Uduyg, and Working Knowledge of E-mail & Internet Usage.
Sr. Production Engineer
Nov. 2009 - June 2012
Company Profile: Manufacturer of Injection and Blow Molding House Holds Furniture Articles, Pails & Containers.
Production Manager
June 2009 - Nov. 2009
Company Profile: Manufacturer of Thin Wall Packaging Products and PET Preform.
Sr. Production Engineer
May 2008 - May 2009
Stallion Plastics Ind. Ltd.
Company Profile:
Manufactures of Injection and Blow Molding House Holds Furniture Articles.
Sr. Production Engineer
Aug. 2004 - May 2008
Al Aziz Plastics Pvt Ltd.
Company Profile:
Manufactures of Injection molding Electrical parts, and PP-R pipe fittings.
Job Profile:
Responsible for production planning, housekeeping, processing, and planning for mould change, productivity etc....
Manage Productivity with Global Quality Standard & Minimum Rejection
Day to Day Major / Minor Fault Finding & Rectification.
Monitoring the Production Processes and Adjusting Schedules as Needed;
Optimization of Process Parameters. Achieve the target within the stipulated time.
Built team spirit & Enhance Co-operations.
Supervising and Motivating a Team of Workers.
Implement Preventive Maintenance Schedules of Mould & Machine.
Devising cost Saving Measures & Implementing them .
Effective Utilization of Manpower.
Interaction with Outside Parties.
Estimating how long a job will take Costing and Setting the Quality Standards
Responsible for: the Selection and Design of plant Equipment; the plant layout; Materials Handling;
Production Planning (Including Demand forecasting, Production scheduling and ordering of Material).
MACHINES HANDLE INJECTION AND BLOW IMM 50 Ton to 775 Ton
M/s Ferromatic Milacron Ltd, India Plc Controller
M/s DGP Windsor India ltd, India Contactor based Controller. (ST, SP, SPH Series)
JON WAY Taiwan Machine Corporation
CMP, Jagmohan Blow Molding.
Material Handling:
PP, PP-R, PVC, HDPE, LDPE, HIPS, ABS, SAN, PC.
Work as a Production Manager
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com