Diploma in plastic and polymer Government polytechnic,nashik in 2018 with 72.50%
Ssc Maharashtra State board in 2015 with 78%
SKILLS
• Line balancing
• Manpower handling
• MS-Office
• Creativity
• Analytic thinking
Production officer
From Feb 2020 - till date
Company profile- largest manufacturer of moulded furniture and Asia's largest plastic processor of moulded.
Job profile-
1.doing mould change as per planning order.
2.solving all process related problems (sink mark, flash,short shot,flow mark, drulling ,warpage ,burn mark etc)
3.handling of various types of machines(3000tone,1250tone,1075tone,675tone,660tone etc)
4.handling of various material pp,Hdpe,LLdpe,Ldpe,etc
5.manpower handling(25)
6.documentation (ads,daily production report,CAPA,PDS,MPDS,cycle time record,5s sheet,etc)
7.maintain 5s on line.
8.achieving good productivity and OEE.
9.making production planning as dispatch order.
Junior engineer
From May 2018 - Feb 2020
Company profile- leading businesses in the Breaker Manufacturers
Job profile-
1.checking mould temperature.
2.doing mould changeover as per production plan.
3.solving all plastic injection moulding related problems.(burn mark,short shot,weild line,flash,scratch
mark,surface unfinished,bubble mark,flow mark,jetting)
4.documentation (line startup,LPC,TPM sheet,Mould Temp,barrel Temp,moisture test,week code,14Q audit
plan,4m sheet,output tracking,OEE and losses,OPL,8Q audit plan)
5.handling the 5 plastic injection moulding machine in a shift.
6.achieving oee 92%.
7.doing mould PM.
8.handling manpower(25).
9.good productivity(68.75)
10.maintaining 5s on line.
PROJECT DETAILS
Title : An ergonomically designed frp poles for prevention of casualties during road accident.
Description : we designed a ergonomically fiber reinforcement poles for prevention of causalities during road
accident.that can we save many more lives. the major factor in this project is cost the cost of frp
pole is half of metal street light pole(including solar system) frp pole does not require electricity.
Duration : april2017 to may2018
Role : Team leader
Team Size : 5
To obtaining a challenging position in a high quality engineering environment where my resourceful experience and
academic skills will be add value to add organizational operations.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com