+2 Gov. High School, Perampattu, 2003
Deee Tirupattur Polytechnic College, Tirupattur 2006 (66%)
Dbm Isbm Bl 2010 (70%)
Mba Isbm Blr 2011 (82%)
Word
Excel
Powerpoint
Team work
communication
Production & Maintenance Manager
From :- July -2025 To Still
Company Profile :- Manufacturer Of Rigid Plastic Packaging And Engineering Components
Job Profile :-
New Machine Unloading And Installation & Hand Over To Production Dept Properly.
Made The Air Line & Water Line And Material Loader Conveyer
Following The Amc & Machine Spares & Quotations
Every Day Following The Ro Plant Activities And Arrange Chemicals & Microns & Salt
Everyday Morning Mom Will Discuss The Break Down & Pm Schedule ..
Avoid The Bd And Mints And Take Care Of Pre Action
Reduce The Power Consumption And Utility Running Costing
Each And Every Machine Spare Arrangements & Po Approval From Md
Analysis The Break Down And Shot Out The Reasons
Following The Suppliers & As Per Required Materials
Production & Maintenance Manager
From :- June -2022 To July-25
Company Profile :-Manufacturer Specializing In Roto-molding And Injection Molding For Plastic Products, Including Water Storage Tanks, Cold Storage Solutions, Waste Management, And Defense Components
Job Profile :-
Planning For Raw Material Based On Sales Team Confirmation.
Planning For Production Priority Base And Product Wise With Zero % Rejection
New Product Implement And Trial Taken Approved From Customer Side..
Samples Sent To Customer And Confirmation .
Saving By Power Consumption And More Productive.
Every Month Production Revie Meeting & Solve The Operators Requirements
Follow Up The Over All Machine Amc And Calibration.
Man Power Cost Reduction And Power Cost Also Reducing.
Preplanning For Machine Preventive & Cleaning Activates.
Every Month Update The Production Costing And Power Costing.
Every Day Updating The Fg Stock Details And Sales Details.
Daily Rejection Analysis And Immediate Corrective Action.
Day To Day Production Cycle Increasing And Down Time Delay Arrived.
Reduce The Overhead Cost And Man-day Cost.
Production & Maintenance Manager
From :- Oct 2020 To April-2022
Company Name :- Time Technoplast Ltd
Job Profile :-
Preplanning Of Raw Materials And Accessories As Per Market Confirmation.
Planning For Product Wise Production Planning.
Reduce The Power Consumption & Manpower
Improve Production With Shift Wise Good Quality
Arranging By Maintenance Spare Items & Following Amc
Update The Day-by-day Reports To Ho
Completed The Marketing Monthly Target
Following By Dispatching
Production & Maintenance Asst Manager Blow Moulding
From :- Jan-2015 To Oct-2020
Company Name :- Vectus Industries Ltd
Job Profile :-
Pre Planning Of Raw Materials And Accessories As Per S & Op .
Work Allotment, Man Power Handling, Shift Allotment For Weekly Basic.
Planning For Next Production Batch, Achieving Weekly Targets With Zero (0) Rejection.
Inspecting First Product And Preparing Reports.
Looking For The Way To Improve Efficiency Of Workers And Machines.
Maintaining The Records For Production As Well As All Employee Files.
Production Job Card Moving For Next Department.
Parameter Setting Of M/c And Machine Setting.
Maintaining The 5s In Shop Floor Area.
Ensuring Good & Healthy Working Environment
Generating Production Report On Daily, Weekly & Monthly Basis
Production Engg
From :- Dec-2009 To Jan-2015
Company Name :- Sintex Industries Ltd
Job Profile :-
Production Planning As Per Monthly Sales & Operations Planning.
Pre Planning Of Raw Materials And Accessories As Per S & Op .
Organize And Planning Of Manpower With Minimum Level.
Quality Trouble Shooting In Online Process.
Preparing The Daily, Monthly Production, Report, Inventory Report, Mis Reports.
Handling Breakdown And Preventive Maintenance Activities In Machine And Moulds.
Controlling The Rejections & Utilizing The Scrap Through The Scrap Handling Policy.
Lpg Consumption Level Reduced From.22 G/kg To .18 G/kg In Roto Machines.
Reduced The Rejection Scrap Level From 5% To 3%.
Targeting Production According To The Budget With Minimum Wastage.
Minimizing The Cost Of Production In Finishing Department.
Setting Of Production Targets & Achieve Those With Set Frame Of Time And Cost.
Automation And Productivity Improvement.
Service In Charge - Emerson Make
From :- June-2006 To Dec-2009
Company Name :- Accutech Info System Pvt Ltd
Job Profile :-
Service &Customer Support:
Visiting The Customer Place To Check Out The Performance Of Our Product Under The Site Conduction.
Visiting The Customer Place For Repairs & Service Supports Of Ups
Maintaining The Amc Of Costumer As Per Amc Calls
Get The Costumers Feed Back On The Products
After Getting Feed Back From The Customer , Prepare The Report For Product Which Will Be Efficient And Satisfactory.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com