Production line in charge
From Sep2020-Till now
Company profile- Manufacturer of Truck and Car Body parts, Spare And Automotive Parts
HOC (HEAD OF COMPANY) control and responsible of production line, maintenance and assembly sections
From Mar2016 - Apr2020
Machine maintenance and DEPARTMENT HEAD of moulding production line
From Jan2015 - Mar2016
Moulding production line incharge, line Coordinator, Mould and process parameter setter of injection moulding machines.
From Nov2014 - Jan2015
Company profile- leading manufacturer and supplier of UPVC compact ball valves
May 2013 - Aug 2014 : SL LUMAX CORPORATIONS LIMITED, Irungattukottai SIPCOT, Chennai
Mould setter and process parameters setter in the field of moulding.
Job profile-
•Testing of Injection Moulding machine ranging from 40 to 1000 tonnages.
Performing start up of the machine
•Ensuring proper hose connections and electrical connections of the machines.
•Filling oil in tank upto the max level .
•Performing leveling and achieving within the tolerance .
•Connecting main power supply to the machine and checking its continuity.
•Performing drive setting in servo motor machines and checking the direction of motor rotation.
•Switching on the machine and clearing all the alarms that are displayed in IBED
•Doing pump commissioning and ensuring the maximum system pressure
•Doing movement of clamping unit ,injection unit and screw rotation with moderate speed and pressure.
•Running the machine in dry run with dummy mould loaded with moderate tonnage for 2000 cycles.
Checking oil leakage and any abnormalities during dry run and troubleshooting of it immediately.
Performing Barrel loading & Plasticizing
•Removing the screw from the barrel and ensuring no damage ,rust or dent mark in the screw and ring plunger set
•Loading the barrel and coupling the screw with hydromotor
•Switching the heaters and checking the load taken by the heaters.
•Ensuring all the zone temperatures had reached the set value.
•Fixing the hopper and loading the material
•Doing back pressure tuning.
•Taking 5 shots and checking the weight are within the standards.
•Checking injection velocity and plasticizing capacity .
•Testing of ring plunger set .