Ref. No. : CA - 34885 - (Production - Moulding – with 7.8 years in Plastic Industry)

Education

2017 DIPLOMA (Mechanical Engineering) from B.T.E Board Lucknow .
2013 10th from Tara high secondary school from Allahabad Board.

Skill Sets

5S,3M,7QC-Tools,OEE,MS-Office.
Poke-Yoke, KAIZEN , CAPA
Manpower handling,Shop floor management.
Metal surface treatment process ( Degreasing, blasting, phosphating & coating mixing).etc

Work Experience

Production JR.Engineer.
From -June 2018 to till now
Company profile -manufacturer of anti-vibration Rubber & Rubber to Metal Bonded components

junior engineer
From -Aug 2017 to Dec 2018
Comapny profile - Automotive components

Job profile -
Responsible for maintaining 5S on the shop floor. Manpower planning according to plan received from PPC. Responsible for improvement practices like Kaizen and POKA-YOKE in shop floor to improve productivity Daily rejection analysis and applying the counter measures to the problems by using 7-QC Tools, Why-Why Analys Responsible for daily, weekly and monthly reports which include PRODUCTION REPORTS, SCRAP RATIO, OEE, PPM STATUS, REJECTION TREND, TOP THREE DEFECT ANALYSIS and Action plan for quality and productivity improvement. Responsible for production planning to meet daily production targets as per monthly production schedule.. Conduct training session for newly joined worker and supervisors with the help
of Training Induction Video Module. Building team spirit among the workmen and also motivating by means of personal involvement. Responsible for timely packing and dispatch as per schedule. Red Bin analysis on daily basis and take corrective action to reduce the percentage of rejection. Plan, Execute and follow up the production activities, planning strategically to enhance productivity, by making optimum use of the available resources. Prepare daily production report and Downtime analysis with team to improve production efficiency. Responsible for all production related document, check sheets etc. Ensure that the production is cost effective by calculating compound wastage for every running item on daily basis.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com