MECHANICAL ENGINEERING FROM I.E.R.T., ALLAHABAD in 1994
MBA FROM NIBM, CHENNAI. IN 2010
MS Office (Word, Excel,), MINITAB, ERP,SAP
Increase plant utilization from 70% to 98% in LML ltd
New line set up of molding machines, and increase of efficiency of plant from 75% to 99 % in 6 months in Videocon.
Handle six sigma project in Videocon for 12 lacs rupees per month saving in different cost reduction and energy conservation projects PROJECT.
Implemented 5S and increase sale to 23 cores in present company
Plant set up of sacmi machine and CSD lines in oriental containers
Launching of new ABS and PC plating parts for
For GENERAL MOTORS,FORD,NISSAN,Mahindra and BAJAJ,TATA four wheeler and two.wheelers
production In-charge
From - 2016 to till date
Company profile -Company is leading manufacturer of plated components for 4 wheelers and 2 wheeleres
Job profile -
Over all utilization of plant and achievement of targets of plating round/day targets of molding components production
preventive maintenance of machine and mold and tool.modification as per requirements of plating
Looking for new product development for market
Interaction with customer for generate orders
Reduction of waste and increasing material yield.
Sr. Engineer – production
From - Dec 2006 – Jan 2016
Company profile - Company manufacturer of CTV, REFERIGERATOR, WASHING MACHINE having different brand such as sansui, toshiba, akai.
Job profile -
Monitoring Production process and quality System on shop floor i.e. utilization of Injection Moulding machine etc. Executing Production Plan, Scheduling, Control Moulding Parameters, process method. Trial and testing of tools for development, Quality System implementation ,looking six sigma project.
Engine Production
LML LTD,KANPUR(SCOOTERS UNIT)
Jan 1995 to Dec 2006
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com