Ref. No. : CA - 35394 - (Production - Moulding – with 6.7 years in Plastic Industry)

Education

Central institute of plastic engineering and technology.2018 Diploma in Plastic Technology.75%
GPRP I C Kurri Sudauli Bachhrawan Raebareli.2012 HSC (12 Class) 60%
GPRP I C Kurri Sudauli Bachhrawan Raebareli. 2010 SSC (10 Class),55%.

Skill Sets

CAD CAM
CCC
Excel
Word
Window 7&8
PowerPoint

Work Experience

Production Department.
From - 2th June 2021 to till Date
Comapny profile - manufactures and assembles plastic products for healthcare, consumer, personal care and automotive and engineering

Job profile -
Troubleshoot and adjust molding parameters to maintain quality and maximum product output
Coordinate tooling and equipment availability repair and maintenance.
Ensure cleanliness and maintenance safe work environment within molding department.
Maintain high productivity and process working.No lapse in process,give higher productivity constant monitoring on quality and quality.keep close watch on Operators.carelessness and poor knowledge due to operators.
Monitor working SOP and follow procedui of production,line clearance uniform policy,training,RAW Material and Housekeeping.
To find out lapses in production and take corrective action no bye passed,accepted ,no rework for cost and time saving
,ensure Quality and production standard norms.
Ensure Trouble Shooting for product Quality not matching with standards.
Maintain minimum machines down time during change over mould change an take corrective action.
Maintain mould change time as per standard.
Impart skill training to new workers as per standard procedure and make assessment

Production Engineer.
From -4th jun 2019 To 30th May 2021
Company profile - manufacturer of Plastic Containers and Jars etc

Job profile -
Troubleshoot and adjust moulding parameters to maintain quality and maximum product output
Coordinate tooling and equipment availability repair and maintenance.
Ensure cleanliness and maintenance safe work environment within moulding department.
Injection molding startup trouble shooting .
Mould loading and unloading in 1700 tons m/c to 2700 tons m/c.
Attend International Exhibition at Plastindia 2018.

Production Engineer
21ST may 2018 1 June. 2019
Yanfeng Global Interiors Pvt.ltd.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com