DIPLOMA MECHANICAL (PRODUCTION) RISHI RAM NARESH TECHINCAL INSTITUTE U.P.B.T.ELOCKNOW 2018 75.4%
INTERMEDIATE SWAMI VIVEKA NAND I COLLEGE U.P BORAD 2015 80%
MATRICULATION BAPU SMARAK I COLLEGE U.P BORAD 2013 79%
OPERATING SYSTEM: Win (95/98/2000/XP/VISTA, Win 7, Win 10).
MS OFFICE WORD, EXCEL, POWERPOINT
BAR TENDER SOFTWARE.
ERP Navision software.
Junior Engineer
From- May 2021 to APRIL 2022
Company Profile- manufacturing of different kinds made of Plastic house hold product &Kitchenware product as SS Water bottles, Flask, Casserole & Storage Container etc.
Job Profile-
5S, Kaizen ,Poka Yoka ,DWM Board ,Raw Material Inspection ,Skill Matrix ,Maru A ,7QC Tool, Cycle Time , Take Time, Lead Time, Lean Manufacturing, CAPA, PPAP, TPM, PPM,GCA Defect, 3R, 3M, O.E.E, Productivity, Knowledge of Safety (PPE), Manpower Handing, Material Handing. M.R. P ,N.P.D, E- Bill, Invoice, Purchase Orde
LINE LEADER Production (Assembly Shop)
From- MAY 2018 to April 2021
Company Profile- Manufacturer of Seating Systems for Automobiles
Job Profile-
Responsible for sequence production of seat sets used in various Maruti models (Ertiga, XL6, S-Presso, Baleno, Swift A-Star Wagonr,SX4 ).
Supervising Seat Assembly Line and Achieving Daily Production Targets.
Looking after both Metal Frame assembly & PU/Trim assembly.
Daily defect analysis through 3G,3M,3R meeting and applying the counter measures to the problems by using 7-QC TOOLS, brainstorming, WHY- WHY Analysis.
Responsible for continual improvement on the shop floor (KAIZEN, WASTE REDUCTION/REJECTION CONTROL, LINE BALANCING).
Properly Recording & Analysis the Production and Rejection Data per Shift and taking corrective and preventive actions.
Preparation and upgrading of documentation of running products (WORK INSTRUCTION, STANDARD CHECK SHEET, DEFECT CHECK SHEETS, AND PROCESS PARAMETER CHECK SHEETS.)
Handling of all production/Assembly activities in engineering product.
New line balancing, time study & OEE calculation.
Continuous Working towards Quality & Productivity Improvement through Kaizen Activities, 5S Implementation, Trainings, Safety& Audi.
Daily Meeting with production team regarding, Safety Quality 5S, Productivity Rework, PDI and other Frailer in process .
Tooling, Fixture Material Movement and Material Handing For Existing.
RED BEN ACTIVITY- Time to Time Rework Clean from the Line Daily Attend the Rejection Meeting.
PROJECT
RISHI RAM NARESH TECHINCAL INSTITUE DESGIN OF KNUCKLE JONIT 45 DAYS
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com