Ref. No. : CA - 31771 - (Designers - Dies & Tools – with 32.3 years in Plastic Industry)

Education

Post Diploma in Plastics Mould Designing from CIPET, Chennai in 1992
Diploma in Plastics Mould Technology from CIPET, Chennai in 1991

Skill Sets

Core Competencies
Managing Tool Room Operations
Resource Management
New product Launch
P&L Management Cost Optimization
Process Enhancements
Team Building & Leadership

Work Experience

Manager Tool Design and Development
From Dec'18
Company profile- A company involved to make Plastics components for automobile companies.

Job profile-
Checking the feasibility of product for design the mould as per the machine specification and to update in APQP plan.
New RFQ closure with feasibility of tool checking and enter in ERP.
Mould design review with development team on daily basis and to make Tool Time Plan as per target dates.
Mould trial to be conducted with production and quality to raise the mould and quality issues cavity wise and to trouble shoot the problem.
Participate in APQP, PFMEA ,CFT, PPAP,ISO/TS meetings and meet the requirement of all necessary documents for internal and external customer audit.
Coordinate with suppliers regarding Tool Development and to update project status report for every project in hand on weekly basis as per plan.
Lead team for improvement in 5S, and to provide software training to enhance their skills level.
Visit to the customer end regarding any tool correction and modification required in the tool.
Monitoring the tool maintenance plan daily and to conduct as per schedule.

Manager-Tool Room
From Nov’12-Nov'18
Company profile- leading rigid plastic packaging manufacturer

Aug’08-Oct’12 with Hawk Industries Pvt. Ltd., Greater Noida as Tool Room Manager
Directing a dynamic team of 100-150 employees and spearheading the activities of Tool Room Operations across PAN India in 17 Plants.

Key Result Areas:
Interacting with client through deep discussion on dimensional geometric tolerances that are critical to quality on the product to finalize business deals and deliveries
Suggesting design modification based on client requirements; CNC machining for core cavity, conducting rapid tooling in epoxies for prototyping moulds
Designing conceptual ideas and sketching, also preparing CAD models and leading realization of actual product
Evaluating the problem on product and suggesting solution to the customers for product modification as per the tooling operational aspects
Documenting and maintaining track record of engineering expenses related to the product development
Managing PFMEA, Gauge R/R study, Five Why Analysis, Fish Bone Diagram, CPK for any potential cause of product failure and taking permanent countermeasures
Formulating work instruction to the machine operators
Spearheading vendor performance analysis and ensuring timely delivery of materials
Supervising procurement of mould base and standard items from approved supplier in international and local market

Feb’06-Jul’08 with Nilkamal Plastics Ltd., Greater Noida as Dy. Manager-Tool Room Highlights:
Mould maintenance as per schedule and updated in erp including critical spare parts requirement.
Administered the indigenization of various hot runner moulds to prevent molten plastics material leakage from hot runner manifold during production to prevent huge breakdown
Successfully completed the six sigma project with a team of 5 Engineers, 4 supervisors, 2 Officer’s and 18 workers by taking list of scheduled mould by technical members in production/dispatch department to discuss on the strategy, planning, risk management, execution & deliveries

Mar’99-Jan’06 with TEJ Shoe Factory, Agra as Plant In-charge-Production Highlight:
Managed the production of soles and led mould development for new design with a team of 4 engineers,4supervisor,
3 inspector & 40 workers

Sep’96-Feb’99 with AMBA Auto Pvt. Ltd., Noida as Sr. Engineer-Design/Tool room Highlights:
Designed moulds with complete detail drawings
Prepared process planning sheet and executed the tool room operations

Sep’92-Aug’96 with PFEDA Synthetics Pvt. Ltd., Noida as Engineer-Development Highlights:
Injection moulds design and new development of moulds in house and out source.
Prepared bill of material &supervised vendor development

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com