Post Graduate Diploma in Plastic Processing and Testing (PGD-PPT) From Central Institute of Plastic Engineering and
Technology (CIPET) Bhopal (Under ministry of Chemical & fertilizer Govt.of India) (An ISO-9001 Certified Institute).
Six months diploma from CIPET including - windows, Internet surfing etc.
Working on ERP Software.
Computer Based Processing Tutorial (CBT) Software (Paulson. Training Programs)
On plastic Materials &Diff. Plastics Processing Tech.
Manager In Blown Film Department
From - April-2019 to till date
Company profile - It is a company of complete flexible packaging solutions created with you at centre. UFL is producing PE films in transparent, opaque and special colors such as blue, yellow, black etc
Job profile-
Production, planning, scheduling and managing the men power to meet the target of maximum OEM and overall answerable of whole production activities of plant.
Calculation of Overall material consumption, Various Losses & their control to meet the optimum requirement for the process.
Monitoring the production at sites and review of project schedule, ensuring cost control with in budget, planning for cash flow requirements, etc.
Executing the job received from PPC and achieving the production target for specific day
Making decision if any deviation occurs in the process and correct the same.
managed inventory of raw material and ensured smooth transition from one department to another
monitoring and making wastage report job wise
Analysis the root cause of wastage generation and working project reduction on the same
Work scheduling that improves employee performance and reduce absenteeism
We are giving the overall answerable for any violation comes during operation
Asst. Manager
From - May- 2014 April-2019
Company profile - one of the largest flexible packaging
Job profile-
job received from PPC and achieving the production target for specific day
managed inventory of raw material and ensured smooth transition from one department to another
monitoring and making wastage report job wise
ensure safe work environment and compliances with EHS policies
making repeated issue list on m/c wise and coordinate with engineering team to correct the same during preventive maintenance
Initiative the quick corrections of breakdowns and preventive action for avoiding reoccurrences
Attained the customer complaint with technical service team and implemented the CAPA on shop floor
Disruption analysis, trend studies and solution implementations.
Ensuring Optimum utilization of resources (Man, Machine & Material) in the department
Efficiency of people measurement and continual improvement
Training and skill growth of people measurement and continual improvement
To utilize all machine resources (Man, Machine & Material) effectively
To improves value addition by new ideas and development and cost reductionc