Diploma In Electrical Engineering From W.B.S.C.T.E. in 2004 With 71.4%
Higher Secondary Certificate From W.B.C.H.S.E in 1999 With 61.4%
Senior Secondary Certificate From W.B.B.S.E in 1997 With 72.6%
Dynamic and technically competent Electrical Engineer with extensive experience of 11 years in Operations & Preventive Maintenance of Electrical Equipments
Demonstrated professional excellence in project planning, scheduling, monitoring, Site Supervision, and execution of projects without incidences of time/cost overruns
Adept at conducting fault diagnosis and failure analysis to promptly overcome operational bottlenecks with demonstrated capabilities in handling the entire range of project management activities
Excellent man-management, time management, and leadership skills
Meticulous and structured approach with super planning & implementation skills
Computer Skills : MS office, Internet surfing & ERP system
TECHNICAL SKILLS: HT, LT Motors, Switch Gear, Transformer, Automation and C&I: PLC, Pr. Switch, Temp. Switch, Level Transmitter, Level Switch, Solenoid Valves
Assistant Manager Electrical : Since Oct 2013
Assistant Engineer Electrical : Feb 2007 to Nov 2013
Company Profile: Engineering company involved in turnkey project execution, projects including bulk material handling projects, mining, water management and sewage ..
Job Profile:
Accountable for managing Ash Handling Plant (HT & LT Motors, Switch Gear, Transformer, Screw Compressor, Dryer, Fluidizing Blower, heater & PLC automation etc)
Involved in 3x30 MW HPCL Thermal Power Plant-CACHAR,Assam.
Responsible for handling Over Hauling Job at Kola Ghat Thermal Power Plant Unit-5
Successfully managed 4x110 MW & 1x250 MW STPS CHP-Operation and Maintenance at Santadih
Handled 7x210 MW NLC TS-II Erection, Commissioning and O&M, 2x125 MW Jindal Thermal Power Plant-Duburi Orissa
Reviewing existing systems & procedures and designed internal controls/quality audit checks for various operational areas for achieving higher operational efficiency, resource rationalization and cost reduction.
Introduced several modifications to reduce incidences of breakdowns
Meticulously implemented safety/environment systems/procedures with periodic reviews
Implemented the system, policy & procedures in the company while outlining the steps to be taken in implementing maintenance program for smooth operations across the unit
Electrical Supervisor
Mar 2005 to Dec 2006
Company Name: DCIPS PVT LTD
Job Profile:
Successfully managed Ash Handling Plant (4x110 MW STPS Santaldi
Maintained of all kind of Plants with all safety precautions as well as area lighting & electrical paper works
Responsible for installing of all electrical circuits of office building and plants
.........
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com