Ref. No. : CA - 4948 - (Quality - Injection Moulding – with 18.4 years in Plastic Industry)

Education

B.Tech (Mechanical) in 2006 with first division.
12th in 2002 with second division.
10th in 2000 with first division.

Skill Sets

Quality documentation strength: BIS
Process Strength: machining
Quality tools strength: 7QC, 5 WHY Analysis
Quality system strength: 5S, KAIZEN, POKA-YOKE, 3G, 3M
Instrument knowledge strength: vernier, micrometer, hygrometer, anemometer, sine bar,
Height gauge, hardness tester, torque meter, lay out inspection.
Computer strength: MS OFFICE, AUTO CAD.
Psychological strength: Creativity & responsibility

Work Experience

Engineer Quality Assurance
Jan 2007 to till date
Company Profile: Automotive (Automotive & house holding plastic parts manufacturer) (Injection molding, brass precision turning)
Process & capacity: 5 injection molding M/C (90 ton to 200 ton) & 15 trob M/C.
Industry turnover: 120 Crore (Annually). Total 3 plants in all over India. (Delhi, Haridwar)
Job Profile:
To take action against quality issue, 5s monitoring BIS documentation & MIS of QA dept.
Quality training on 7QC to down the level.
Root cause analysis against customer complains.
Counter action against on line inspection report.
Step against supplier defect, supplier rating.
Corrective suggestions to vendor.
Process control sheet.
Counter action to achieving customer specific requirement.
To ensure zero defect outgoing quality.
Application through 5S quality program.
Reduce in house rejection at all label.
Incoming inspection.
Sampling of incoming inspection status.
Monitoring of monthly incoming material rejection status.
Counter action with vendor.
Visit to vendor end to get the actual status and correction.
Vender rating.
Std room activity
Monitoring of in-process inspection report.
Schedule shop floor inspection report (check sheet).
Counter action against customer complain.
Customer complain defect analysis through 5 why analysis.
Schedule shop floor inspection report (check sheet).
Pareto chart, control chart, flow diagram.
Incoming material (m/c div.) inspection report.
Vendor material inspection report.
Drawing, IOM (in case of new development parts)
Vendor factory (our ancillary) inspection to give correction.

Future Goals

I want to be a member of a great team which involve in massive production with excellent quality.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com