Ref. No. : CA - 23487 - (Production - Compounds & Masterbatch – with 23.3 years in Plastic Industry)

Education

B.Tech/B.E. (Mechanical) From Veer Bahadur Singh Purvanchal University (VBSPU) in 1994

Skill Sets

SAP PP 

Polymer Compounding, Color Matching,devlopment of new polypropylene grades,knowledge of plastics raw materials and their application,processing of polymers and extrusion line setup,market devlopment and meeting customer requirement

Work Experience

DGM Production
Jun 1996 to Dec 2009
Company Profile: Manufacturer of PP Compounds (PCMA) & Advanced Materials
Job Profile:
Working as DGM following responsibilities were being handled.
Production Planning And Control
Preventive Maintenance Of Extruder And Dosing Units
Control of Scrap and Rework Generation And Their Proper Utilization.
To Increase Equipments Overall Efficiency.
Implementation of Value Engineering Techniques So As To Reduce Manpower and increased efficiency of equipment.
To Maintain Good Housekeeping In Plant And Developed Systems To Reduce Air And Noise Pollution In Plant.
Proper Utilization Of Resources Like Water, Air And Power.
To Produce High Quality Product By Calibrating Equipments Regularly
Reducing Grade Change Time And Breakdown By Proper Planning.
To Make Our People Efficient By Giving Them Proper Training And Instructions

Production Engineer
Jun 1994 to May 1996
Company Profile: Manufacturer of Home appliances and Personal care products.
Job Profile:
Vendor Development and Product Development

Duration: Jan 2008 to Mar 2008(Onsite)
Project Name: Coperion, Berstorff Extruder Installation
Company: Coperion, berstorff & Steer Omega M/C
Team Size: 5
Location: Machinopolymers Limited
Role: Project Leader
Skill Used: Extrusion Process And Gravimetric Feeding Systemsskill
Details: Coperion, Berstorff & Steer Omega 40 Extruder Installation

Duration: Nov 2007 - Jan 2008 (Onsite)
Project Name: Extruder line Setup
Company: Berstorff Extruder
Team Size: 5
Location: Machino Polymers
Role: As a Project leader
Skill Used: Past experience of Line Setup.
Details: Three Berstorff Extruder Lines setup done.
Gala UWG Setup was done

Future Goals

Growth

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com