B.Tech, (Electrical & Electronics Engineering), From Avanthi Institute of Engineering and Technology, JNTU, Hayathnagar, Hyderabad, A.P, India in 2011 With 67.18%
H.S.C From Rao’s Junior College, Nandyal Mandal, Kurnool Dist., A.P, India in 2007 With 74.4%
S.S.C From Samatha Vidya Niketan High School, Nandyal, Kurnool Dist., A.P, India in 2005 With 64.5%
MS Office:
All type of computer installations
Operating system like window service pack 2, windows vista, windows 7
Computer Hardware
Handling SAP entries like production & quality screens
Plant Manager
Since March 2012
Company Profile: Manufacturer of PVC pipes
Job Profile:
Conducting Tool Box or Safety meeting and discussing on the topic allotted for that week by production Department.
Applying for the Work Permits and Isolation permits for the present day scheduled preventive maintenance equipment
Visual Inspection of the critical equipments like Air Compressors, 200kva ups & 300kva ups, AC drive’s
Monitoring and preventive maintenance of 500 kva & 250 kva Diesel generators.
Raising request for the materials for the regular maintenance and implementation jobs .
Monitoring the parameters of critical equipment and informing to the concern department for the load scheduling.
Maintaining Maximum Demand load .
Performing the duties of Motor Repair Shop.
Coordination with other departments for a perfect planning to execute critical equipment preventive maintenance.
Corresponding with the MAIN PLANT Central Motor Repair Shop for the status of faulty motors. Making arrangement to bring the motors back as early as possible to Smelter.
Collecting the requested material from central stores.
Executing the Implementation Jobs without disturbing the regular production activities.
Performing the Breakdown Voltage test for the transformer oil periodically and suggesting to higher authorities if it requires filtration.
Execution of Preventive Maintenance (PM) schedule without any delay.
Preparation of Daily Progress Reports and mail to immediate superiors.
Preparation of Monthly Progress Reports and Achievement graphs.
Signing on time sheets of the workers.
Computing the total man hours and sending necessary documents to the regional office for the preparation of the monthly bill.
Achievements:
Worked as a In-charge for the electrical maintenance crew during the absence of concerned person and executed my duties successfully for every months without breakdown of any equipment. Achieved zero production loss due to the breakdown of electrical equipments.
Handled Motor Repair shop successfully as a work shop in charge.
Got promotion in joining of 8 months for best performance.
Prepared the scheme for the extension of feedback of monitoring system of the generators fuel pumps.
Electrical Engineer
Aug 2011 to March 2012
Company Profile: Pipe manufacturer
List Of Equipments Handled:
Earth Resistance Tester
Tongue Tester / Clamp on meter
Temperature detector
Tacho meter
List of Package / Systems Handled:
Machine Monitoring – Vibration & Temperature Monitoring
HT System – 11kV, 33kV, Panels and Equipments
Battery Banks – Up to 200 AH Battery banks preparation and maintenance.
Panels – ABB, SIEMENS, L&T
Motors – Up to 100 HP Motors – testing and commissioning and Maintenance.
First Aid Training
Trained in safety and first aid treatment in St. Jhon Ambulance Association of A.P State Center Sultan Bazar, Hyderbad , Andhra Pradesh, India
In search of position as an Electrical Engineer and want to work with a progressive and forward thinking company where I can utilize my skills.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com