2009-2012: B.E. Mechanical Engineer ing-V.M.K.V Engineering College, salem.-74%
2007-2009-S.M.Arumugam polytechnic collage-82%
2006-2007 Govt. Hr. Sec School, B.Agraharam-64%
2002-2003: SSLC .Govt. Hr. Sec School, Halepuram-79.6%
I have competent 6 +Years experience in Quality Assurance and also I have exposure one
year in Design and development department as an additional experience.
Good experience in drawing of Basic equipment drawings.
Good Experience in using measuring instruments like metrological instruments, Digital micrometer, digital vernier, profile projector, etc.
Good knowledge of SPC.
Mechanical Design Software : Autocad,
Operating Systems : Windows 8
Good Experience in using measuring instruments like metrological instruments, profile projector etc.
Good knowledge of SPC.
Engineer - Quality Assurance Department
Since Oct 2016
Company Profile : Manufacturer of vacuum circuit Breaker cover for high voltage Transmission line to ALSTOM Group Chennai .
Job Profile :
Prepare the PPAP documents
Incoming Inspection
Final Inspection
Product Audit.
Doc Audit..
Find the solution against the customer complaint by using 8D
Doing 5S activity.
Development (Quality) Components.
Responsible for testing equipment like UTM, Harness Machine .
Engineer - Quality Assurance Department
Jun 2012 to Oct 2016
Company Profile : A Manufactures of cold forged and machined automotive components for use in steering systems, switch housings, Transmissions, Fuel injection systems and drive train applications for Customer like: American Axle Manufacturing, Spicer, Bosch, RSB Transmissions, DANA holding corporation, INA Bearing India, Rane, Eaton, Black & Decker, AVTECH, Main Precision Ltd etc.
Job Profile :
Prepare the PPAP documents
Incoming Inspection
Final Inspection.
Layout Inspection (New Die Sample)
Product Audit.
Doc Audit.
Facing the TS 16949 audit.
Find the solution against the customer complaint by using 8D
Doing 5S activity.
Development (Quality) Components.
Working in Quality Assurance department as a layout inspection
Doing the SPC.
Preparation of one point lesson for give awareness of operator.
Preparing of check Sheet, First off Inspection, Inspection Work Instruction
Carried out the Rejection sorting out.
Customer Complaints against Analysis.
Design Department
Responsible for both design & development.
Analyzing customer drawing TFR for technical feasibility.
Design & implementation of P-FMEA, Process flow diagram, PPAP, Process sheet
& Control plan and Updating ECN.
Prepare the APQP File.
Achievement
Secured Second Rank in10th Standard in school .
To seek a challenging position and to dedicate my service to a reputed organization and expose my talent and skills for the development of the organization.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com