Ref. No. : CA - 27066 - (Production - Extrusion - Woven Sack – with 9.7 years in Plastic Industry)

Education

B.Tech in Mechanical Engineering From UPTU, Lucknow, in 2016 with 67.52%

12th From Lucknow Public School, Hardoi, in 2011 with 74.20%

10th From Lucknow Public School, Hardoi in 2009 with 76.83%

Skill Sets

Implementation of TPM and lean manufacturing techniques and processes. Minimize problem related to production with 5 Why Analysis, 5W2H, Fish bone Diagram. Working on Line balancing to reduce production loss. Ability to do trouble shooting of the Process problems affecting the production, quality & rejection with the help of QC tools. Analysis for equipment break down/ product NC / Zero quality issues / Production variance in shop floor. Sound knowledge of assembly line.

Good knowledge of MS Excel, word & PowerPoint.

Work Experience

Engineer
From January 2015 to till date.
Company profile- Manufacturers of Flexible Intermediate Bulk Containers or FIBC, also known as Bulk Bags, Big Bags, Jumbo Bags for industrial and bulk transportation of cement, food grains, chemicals, fertilizers, pharmaceuticals and such material.

Job profile-
Current Projects are Reduce Fabric Wastage and R&D in Needle Loom regarding quality
and reducing wastage.
Manpower planning/handling& optimum utilization of resources
Ensure proper maintenance of M/C. ? Ensure proper execution and meeting of targets as per daily production plans
Planning of day to day production to achieve maximum production & hourly monitoring of
the same.
Preparing and implementing action plans effectively to maximize overall equipment
efficiency of production machines.
Ensured proper housekeeping ( 5S) and coordinating with operators.
Examine the needs for training and provide on the job training to departmental
personnel.
Leading TPM implementation team and follow up.
Analysis of problems & Root Cause Analysis to reduce fabric wastage.
Motivation of supervisor and workmen to improve loom production efficiency.
Supervisor and Manpower Handling

Major Achievements:-
Minimize fabric wastage 5% to 3.8%.
Reduce BOPP tape shifting problem from 8 shuttle loom.
Improve efficiency 70% to 75% by reducing production & breakdown losses of loom.
Improve efficiency 67% to 75% by reducing breakdown losses of needle loom.

Training Attained:
5’S, TPM, Lean Manufacturing, Ultrasonic Cutter setting, OEE.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com