Ref. No. : CA - 41054 - (Production - Moulding – with 10.4 years in Plastic Industry)

Education

Diploma In Electrical Engineering From Govt. Poly, Baran Form Bter, Jodhpur (Rajasthan) (2013-2015) With 65% Marks .
Matriculation Rbse Rajasthan Board (2010) With 72% Marks.
12 Th. Rbse Rajasthan Board (2012) With 68% Marks.

Skill Sets

Industrial Software Such As Sap.
Computer Skill In Microsoft Office, Operating System, Networking, Internet.

Work Experience

Engineer
From :- 2016 Jan 07 To Till Now
Company Profile :- Specializing In Compressors, Hvac Units, Heat Exchangers, And Bus/truck Ac Solutions

Job Profile :-
Come To Work:-
Check Production Performance Of Last Day.
Check There Is No Without Identified Parts Arround Injection Moulding Machine.
Check Change Point Board 5m+1e Of Previous Shift.
Prepare For Morning Meeting Agenda Discussion.
Production Preparation & Morning Meeting:
Shift Starting Excercise.
Attendance Of Manpower And Discussion On Absent Manpower Status
Communication About Previous Day Abnormalities And Change Point.
Discuss Today Production Plan.
Share Any Important Information Visits, Audit And Customer Complaint.
Share All Morning Meeting Agenda And There Key Point.
Touch And Call Activity.
Line Start:-
Depute Manpower As Per Skill Matrix Of Respective Station
Check The First Part By Self And Take Care Of Any Non-compliance.
In Line Running:-
Check Operators Are Working As Per Work Instruction And Control Plan.
All Control Charts And Machine Check Sheets Process Parameter Hourly Filled Properly.
Check Poka Yoka And Guages Where Its Require.
Fill Abnormality Sheet And Maintain As Per Sheet.
Fill All Documents Related Production And According Dwm.
Check Material Availability On Line.
Check Hourly Production Report And Take Action If Any Gap.
Preparation Of Shortage Of Tool List, Checking Manpower As Per Tie,long M/c Breakdown Share With Related
Department
Check The Availability Of Consumable Items For Next Two Shift.
Manpower And Material Planning For Next Two Shift.
Check Identification Of Defect Parts.
Review Of Previous Pending Points And Discuss Present Status.
After Work Finish:-
Check All The Pieces Are Completed By Operators.
Keep Good Condition For Next Shift.
Check And Analysis Of Defect Parts.
Updating Of Communication Board And Log Book.
Say Thanks To Operator For The Hard And Smart Work.
End Of Work:-
Share Today Change Points, Production Details, Quality Defects Etc.
Written Production Data Plan V/s Actual.
Discuss Reason For Variance And Define Countermeasure.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com