Ref. No. : CA - 14878 - (Production - Moulding – with 15.1 years in Plastic Industry)

Education

PGD-PPT (Post Graduate Diploma in Plastic Processing & Testing) from CIPET, Ahmedabad with 83.00%

T.Y.B.Sc. Exam in March 2009 from V.N.S.G.U., Surat with 58.70%.

H.S.C. Exam in March 2006 from G.S.E.B. with 55.20%.

S.S.C. Exam in March 2004 from G.S.E.B. with 70.57%.

Skill Sets

Knowledge About Field:
Processing:
Injection Moulding Process

Testing:
Quality Control

Computer Skills:
Basic Knowledge Of Computer ( Microsoft Excel, Microsoft Word, Power Point), Sap

Work Experience

Production Shift Engineer (Injection Moulding Department)
Since January 2015
Company Profile: Manufacturer of plastics injection molded products like hangers and sizers, trolley bags, jewelry case, etc

Production Shift Engineer (Injection Moulding Department)
August 2011 to December 2014
Company Profile: Manufacturer of precision custom injection moulding in engineering with plastics for various critical industrial components such as Valves, Pipe fittings, Pre-fabricated Housing, Filters, Submersible Pump Parts, etc.

Production Shift Engineer (Injection Moulding Department)
March 2011 to August 2011
Company Name: Shefield Technoplast Pvt. Ltd.

Trainee Engineer in Injection Moulding Department
August 2010 to February 2011
Company Name: M/s. Shefield Technoplast Pvt. Ltd.

Job Profile:
M/C handling
Troubleshooting
Man power handling
Daily production report maintaining
Daily rejection report monitoring
Raw material transfer and issue
Quality checking.
Check all the process controlled and process parameter sheet.
Achieving target as per production planning.
Implement & maintain kaizen, 5s house keeping in shop floor.
Set up mould & machine as per process parameter sheet & give instruction to machine operator about product quality and post moulding process.
Machine Handling:.
L&T, Ferromatic, Hwachin, Haiten, Electronica, Asian Plast. 60-Tonnage TO 1200-Tonnage.
Material Handling:
PP (PP homo-polymer, PP Co-Polymer, PP Random Co-Polymer)
PPO (Noryl)
HDPE
ABS
PC
Nylon-6, Nylon-66 (Zytel)
POM (Delrin)
PMMA
HIPS
PC-ABS Blend
PPO-HIPS Blend (GFN3 801+HIPS)
LDPE
LLDPE
SAN
Acheivement:
Corning spool moulding & assembly project team leader.
Part of a team member who successfully completed EVM project of Bharat Electronic Limited in right time

Future Goals

To become a part of a successful & leading organization will not only utilize my skill & abilities but also develop & enrich by placing me in the responsible position to achieve organizational goal.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com