Ref. No. : CA - 10977 - (Production - Moulding – with 13.8 years in Plastic Industry)

Education

PDG-PPT from CIPET- Bhopal
B.Sc. (Mathematics) from CSJMU - Kanpur in 2011
Higher Secondary from U.P. Board Allahabad in 2008
High school from U.P. Board Allahabad in 2005

Skill Sets

Injection Molding & FRP Production & Quality Control, Shop-floor Administration, Trouble-shooting, Problem solving Quality Assurance, Customer Complain Resolution etc.

Explanation Talent:-
Strong willpower, Excellent communication, Smart and smooth Working, Team Working, Administration Man power handling, Well Strength.

Work Experience

Production Engineer
Since April 2013
Company Profile: Experts in Manufacturing and Exporting High Barrier Container, HDPE Container and 38 more Products.
Role
Control all about process and wastage which is act in company.
Reporting- To Production Manager, General Manager
Product- 3 to 100 liter container from blow molding and cap, ring, plug, spanner and many more products from injection molding.

Trainee Engineer
August 2012 - March 2013
Company Profile:Specialization is in precision custom injection moulding in engineering with plastics for various critical industrial components such as Valves, Pipe fittings, Pre-fabricated Housing, Filters, Submersible Pump Parts, etc. Specializing in metal & import substitute solution in engineering plastics
Reporting-To Project Manager, General Manager and CIPET-Bhopal
Product:-Injection molding manufacturing unit make parts of submersible pump, cover of electric instruments, Cowl, (FRP Wind mill parts (Nacelle& Spinner) for Enercon India Ltd, Space maker, Cabin, FRP Door Roof Sheet, Urinal pot, Bath basin, FRP Tanks, Water supply tanks, Water storage tanks ) (Hand-lay-up, Spray lay-up& RTM Process)etc.
Job Profile:
Routine Activities:
Responsible for overall activities related to manufacturing of unit, testing and trouble shooting in plant and short out problem of plant.
FRP Wind Mill Profile:-
Production, testing and final inspection before dispatch, Quality and Production related submitted, Customer complain Resolution and all over administrator and sum instruction following as per management etc.

Future Goals

to develop our own plant

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com