Post-Diploma In Plastics Mold Technology From (CIPET) in Year 2009
Diploma In Plastics Technology From (CIPET)) in Year 2008
Intermediate From B.S.E.B (Patna) in Year 2004
Matriculation From B.S.E.B (Patna) in Year 2002
Software Exposure:
Unigraphics
Auto Cad
Ms Office
Other Capabilities
Knowledge of 5s
Meeting Conducting
Kaizen/ Poka Yoke Implementation
Production Engineer
Present
Company Profile: Leading Manufacturing Of Injection Molding Components, Hot Runner Molded Components Like Hangers And Container
Job Profile:
Responsible For Production As Well As Good Quality Of Injection Moulded Components.
Planning The Daily Production As Per Scheduled And Reporting To Production Manager.
Arrangement Of The Manpower In The Shift And Also Arrangement Of Raw Materials And Packaging Etc.,
Utilization Of Optimum Resources To Achieve Given Target Production: Problem Shorting In Molding Shop Problem Shorting Of Molding M/c Machine Maintenance Involving In Various QC Activities At Every Stage (Production,
Finishing, Packing & Dispatch)
Production Engineer
From Oct 2011 To Dec 2013
Company Profile: Manufacturer Of Thermoplastic Injection Molding Components, Gas Injection Molded Components, Hot Runner Molded Components Like Refrigerator Parts, Automotive Parts Household, Electronics Parts Etc
Job Profile:
Responsible for production as well as good quality of injection moulded components. Planning the daily production as per scheduled and reporting to plant
manager. Arrangement of the manpower in the shift and also arrangement of raw materials and packaging etc.,
Utilization of optimum resources to achieve given target production: Problem shorting in molding shop Problem shorting of molding m/c Machine Maintenance Implementing internal quality audit preparation and ISO 9001 documentation. Involving in various QC activities at every stage (Production, Finishing, Packing & Dispatch).
Production Engineer
From April 2010 To Aug 2011
Company Name: R.K Metal & Plastics Pvt.ltd
Company Profile: This Company leading manufacturing various Type of oil pack container
Job Profile:
Production planning Problem shorting Injection molding m/c Production handling in molding shop Problem shorting in molding shop
Arrangement the manpower as per shift.
Utilization of optimum resources to achieve given target production.
Trainee Engineer
From March 2009 To Feb 2010
Company Name: M.Tech Industries
Company Profile: Manufacturing Of All Kind Injection Mould For Automotive Part
Job Profile:
Handling The Project Arrangement Of The Manpower In The Shift Planning For Project With Our Senior Take A Trail
Handling The All Types Of Con
Technical Capabilities:
Handled Injection molding machines ranging from 90 ton. to 650 ton (Chen De, Jet master Asian plastic, Windsor, Super Master)
Process setup, mould load & unload, process trouble shooting and finalizing the product achieving best standard quality in injection molding.
Handled raw material like ABS natural, ABS transparent NYLONE-6/66,
HIPS, GPPS, DARLINE, PE, PP, PC, Polyethylene oxide and PPCP etc.
Handled Gas Injection Machine, parameter setting, making circuit of gas line to mould.
Increase the productivity as per possible Reduce the rejection % as per possible
Shorting the problem in injection moldin machine Shorting the problem in mold
To built a career with an objective to accept a challenging Position in the filed of engineering and share my knowledge to the benefit of the organization.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com