Diploma In Electrical Engineering From Govt. Polytechnic Faizabad In The Year2014.
12th From U.p. Board In The Years 2010
10th From U.p. Board In The Year 2008.
Self – Motivated
Believe In Myself
Positive Attitud
Electrical Maintenance Senior Engineer
From :- March-2023 To Till Date
Company Profile :- Specializing In Plastic And Rubber-based Extrusion Systems, Injection Molded Interior/exterior Parts, And High-precision Tooling
Engineer
From :- April-2021 To Feb-2023
Company Profile :- Specializes In Manufacturing High-quality Seating Systems, Interior Components, And Plastic Parts For The Passenger And Commercial Vehicle Industry
Engineer
From :- Feb-2020 To March-2021
Company Name :- M/s Radiant Polymer Pvt. Ltd
Engineer
From :- March-2018 To Jan-2020
Company Name :- M/s Atc Precision Component Pvt. Ltd
Assistant Engineer
From :- July-2014 To Feb-2018
Company Name :- M/s Aar Aar Technoplastpvt.ltd
Job Profile :-
Injection Moulding:- Hydraulic-60t To 2800t & Electrical -180t To 1800t Machinemaintenance (Clf, Milacron, Super Master, L&t,toshiba,toyo,jsw,engel, Haitain,bole,yizumi) Blow Molding:- Hydraulic-junyu-30l,,ranasons50-100l,3+-120l. Extrusion Plant;- 75mm -Alpha,60mm-cincenity ,Laser Printing M/c,plasma,roughcut ,Flocking M/c ,Power Press 10t-hind And Stretch Bending M/c . 3-axis & 6-axis Robot:- 3-axis Wittman,star And 6-axisyaskawa Robot. Electrical Maintenance:-phase Preventer Connection ,Star-delta Starter And Dolstarter
Connection , Smps, Ssr, Temperature Card, Pressure Card, Input Output Card, No-nclimitswitch, Relay,contactor,timer, Directional Control Valve Checking &Fitting, Transducer Setting& Testing, Thermocouple Wire ,Sensor Pnp ,Npn. Mechanical Maintenance, Hydraulicmaintenance, Pneumatic Maintenance. Utility Maintenance (D.g.set-500 Kva ,Air Compressor(kaeser 104cfm,cooling Tower-150tr, Water Pump Fitting&connection,chiller(reynold)50t, Rtcc,vcb, Crain-30t/15t,preheatingoven,&maintenance, Capacitor(410kvar)connection, Energy Meter Reading In Kwh&kvahacb- 1250amp ,Transformer 1600kva. Auxiliary Machine Maintenance:-hrtc, Mtc ,Qmc,sequencer Timer Hopper Preheating, Autoloader&dehumidifier Maintenance
Projects Management:- List Of Project Of All Department Of Capex & Opex Items, Ringi Approval Hard&software , Calculation Of Budget, Roi Of Calculation, New Machine Installation & Far. Documentation Work :- Planning & Implementation Of Master List Of Machine ,Pmplan Scheduleyearly&monthly ,Jishu Hozen(daily Machine Maintenance) Preventive Maintenance&predictive Maintenance,breakdown Maintenance, Poke Yoke, Kaizen,5s,4m,machine History Card, Utility Maintenance Checksheet. Calculating The Monthly Data Of Mtbf And Mttr By Verifying All Breakdown Slips. Implementing New Ideas To Reduce Machine Downtime And Analyze The Root Causes Of All Breakdown(why-why Analysis) To Increase Mtbf. Manage All Documents In Accordance With Iso/ts (Iatf)-16949, Vsa, Macemsa, Ehs-14001-45001, Energy Management System Audit & Sustainability Management Systemaudit And Legal Compliance. Conduct Corrective, Preventive (Time Base) Periodic (Condition Base) Maintenance Activities As Thescheduletokeep All Factory Equipment In Perfect Condition. Develop And Maintain Effectively Working Relationship With All Employee Groups And Functiontopromotegood Industrial Relations. Attend The Trouble Shooting Of All Machine To Minimize The Break Down Time And To Increase Availability Always Ensure Operational Safety To Preventive The Accidents And Create Safety Environments. Critical &Spare Parts Inventory And Management.by Sap:- Monitor And Control Spare Parts Availabilityand Consumption To Meet The Machinery Break Down Effectively. Total Productive Maintenance Activity:- Manage To Tpm Activity Planning,tpm8-pillar,tpmimplementation Steps. Pms:- Machine Maintenance Departments Kra*kpis ,Gl,tl.tm Of Kra &Kpis. Desired Skill:- Good Knowledge Of Imm Axillary Utility Maintenance
Good Knowledge Of Electrical Circuit As Applied To Injection Moulding M/c. Good Knowledge Of Sap And Ms Office (Ms Word, Excel,ppt) System. Giving Training To All Employee The Shop Floors Time To Time About Machine Operation. Daily Maintenance Schedule (Dwm & Mpcp). Energy Saving & Optimum Utilization Of Resources And Power & Fuel Cost. Maintenance Cost Saving In Localization And In House Work
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com