Post Diploma in Industrial Safety from Technical Examination Board Gujarat with 63 %.
MBA-Operational Management from Sikkim Manipal University.
B.E (Mechanical Engineering) from SSBT’s College of Engineering, And Technology, North Maharashtra University, Jalgaon, and secured 66.67 %
IMS Implementation.
Closely worked with IMS representative in implementation of ISO 9000:2015,ISO 14001:2015 and ISO 45001:2018.
Safety:
Work in mitigation of fire.
Maintaining of hydrant system.
Attended Safety training and presentations.
Achievement
Received REWARD IN TRAINING PROGRAMMES LIKE 'COMMUNICATION SKILLS’
Identified as Individual in Programmers’ like PROBLEM SOLVING AND DECISION MAKING
Taking Initiative in all departmental other activities like Indoor Games and Presentations.
Identified as individual in Internal Projects Presentation on subject of “Condensate Recovery system.”
Nominated among all engineers to attend 5 Day preparatory course for ENERGY
MANAGER EXAMS which is arranged by Bureau of Energy Efficiency(BEE) at New Delhi in July 2017.(applied for the exams of ENERGY EXAMS by BEE)
Appointed as Facilitator for Quality Circle of Engineering team. And headed the team for Short Term Project completion.
Appointed as Facilitator for the Forum of Qu
Experienced Mechanical Engineer,working as a Deputy Manager (Mechanical) and handling Utility Operation, Machine Maintenance and engineering related projects. Seeking employment in a reputable company where I can apply my knowledge and experience for the benefit of the organization. Here with I am candidature as under:
Deputy Manager-Mechanical Engineering
period-August-2008 to Till Date
company profile- Clothing Manufacturing Industry
job profile-
Operation and maintenance of VAM Chillers & Centrifugal chillers upto 800 TR.
Operation and maintenance of Air washer towers AHU & Cooling towers.
Operation and maintenance of WWTP, DM Plant & Effluent Treatment plant.
Operation and maintenance of Condensate Recovery systems & Diesel Generators.
Operation and maintenance of 14 TPH & 10 TPH capacity AFBC Boilers.
Operation and maintenance of 40 & 30 Lac kcal/Hr Coal fired thermic fluid heaters.
Operation and maintenance of rotary screw type air compressors 650 CFM.
Maintenance and troubleshooting of Processing Machineries.
Maintenance of Material Handling Equipment.
Maintenance and troubleshooting of Processing Machineries.
Installation and Commissioning of Equipment as well as conducting tests & inspections to ensure operational effectiveness of plant utility systems.
Monitoring costs and Executing cost saving techniques/ measures and modifications to Improve equipment efficiency and preparing MIS Reports.
Preparing master data sheet for PM schedule; ensuring safe and efficient performance of Preventive Maintenance for 100% availability of Machines & Utilities.
Preparation and execution of Standard Operating procedures and Good Maintenance Practices in plant.
Preparation of Utility budget and controlling the consumption at target level.
Spares balance investigation and inventory control for all spare parts.
Coordination with internal and external agencies for Project and Maintenance(AMC) works.
Closely working with Instrumentation and electrical departments for resolving machine related issue.
Closely worked with Italian quality representative, who associated with high quality standard and meeting customer complaints of the fabric.
Key Projects handled:
1. HVAC,VAM and Production machine installations and commissioning:
Installation and commissioning of AIR WASHER TOWER (AWT) - LUWA for humidification purpose for plant with conditions erectors team of LUWA
BENGALURU. Total nos of AWT -17 Nos
Installation and commissioning of THERMAX VAM CHILLERS of Different capacities for plant humidification purpose, with the team of Erectors and engineers of Thermax Ltd. and Elixir Engineering
During Installation and commissioning project of WOOL SCOURING M/C (Make
NEW ZEALAND) Worked with New Zealand Erector. The project includes Steam line, water line and Air lines. Worked with ALFA LAVAL team for Installation and commissioning of DECANTER for sludge separation from effluent.
Deputed as an Erection engineer for machine Installation and commissioning of Dyeing top machines relocated from Thane to Jalgaon area Different capacities of 240kg,160kg and 30kg machines with all required Utilizes.
Effluent Treatment Plant up-gradation Project(2012-13):
Erection and commissioning of Centrifuge decanter 15 m3/HR.
Erection and commissioning of pumping stations.
Erection and commissioning of Electro coagulation Machine.
Successful installation commissioning of Sludge dryer.
Plant Relocation Projects(2011-12):
Erection and commissioning of Process machinery.
Designing and Fabrication of utility piping work (steam, Air, Water)
Energy Conservation Projects:
(Utility Saving with Environment Resource Conservation):
Targeted reduction in plant level steam consumption during Year.
Process water recovery and utilization project.
Significant reduction in Drinking water consumption in plant as compares to previous years by proper monitoring and experience.
Compressed loop system up gradation arrangements with respect to high, low and normal pressure requirement.
Installation of Waste Heat recovery system for Stenter machine of finishing department to recover heat and to extract oil from exhaust air.
Improve MTTR & MTBF:
Breakdown Analysis – Department-wise machine breakdown hour recording.
Analysis of major breakdowns - Action plan for root causes.
Improved machine up-time, hence machine working quality
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com