First Class Degree in Mechanical Engineering from MITS Institute under Jiwaji University, Gwalior in the year 1982.
12th, Science from Rajasthan University.
TECHNO - COMMERCIAL SKILLS:
Thermoforming (SHEET MOULDING), Assembly (Auto/Ref.), Press Shop, Fabrication, Paint Shop, High Pressure Foaming, , Assembly of Auto Engines, Quality Receipt (IQC), SQC Techniques, Problem Analysing & Solving Techniques, 7-QC Tools, Servicing (Auto Line), Warranty (Auto Line), Export Cell, Training Cell, Seat Foaming (Auto), Wheel Assy. of Motorcycle.
Plant Head of the Unit.
Since August 2006 till date.
Presently working with a leading company supplying for Discover K-70, Boxer CT-100 and Spares for Export CKD and Export SKD wheel assembly to Bajaj Auto Ltd., Akurdi.
Responsibility:
Responsible for entire manufacturing activity of the plant inclusive of plant & machinery maintenance as well as tool maintenance, Material Planning, Prod. Planning, Purchase and Supply & customer services.
Plant Incharge
Since April 2002 to July 2006
Worked with Auragabad Electrical Ltd., Aurangabad.
Job Profile:
Worked as Plant Incharge of entire wheel assembly and have been associated with it, right from inciption. I have setup the entire plant from green field stage and have been associated with selection of M/Cs & equipment, its eraction, commissioning and operation. The plant is well set and is operating at optimum utilization. The plant has achieved TS certification.
Dynamic Manager - Production
Since November 2000 to March 2002
Worked with Auto Fit India Limited, Dharuhera.
Job Profile:
I was responsible for entire manufacturing activity of the plant inclusive of plant & machinery maintenance as well as tool maintenance.
Achievements:
Initiated & implemented TPM activity & got ISO-9002 certification
Shift Incharge - Foaming
Since February 1995 to October 2000
Worked with Whirlpool of India Limited, Faridabad.
Area of Function:
Foaming:
I was manufacturing Shift Incharge of Foaming, looking after pre foaming assembly and cabinet foaming for refrigerator assembly line.
Thermoforming:
I was manufacturing Incharge of Thermoforming (Vacuum Sheet Molding), looking after liner production of all models, project planning, cutting, punching, piercing, pre foaming, liner assembly.
Raw material planning, supply to refrigerator assembly and Granulation.
Handled SPM’s of Italy & Germany, Used fully computerized SPM "RIGO”
Project 220 Ltr.:
Worked for manufacturing implementation of 220 Ltr for Vacuum - Forming, Evaporator Dept., Prefoaming Assembly for cabinet assembly, Refrigerator assembly line process implementation of 220 Ltr CB.
ISO-Cell:
Documentation and implementation of ISO-9002
Assisting to Production Manager
Since 1994 to 1995
Worked with Kelvinator of India Limited, Refrigerator Divn., Faridabad.
Area of Function:
Press Shop & Paint Shop:
I was incharge of QC Press & Paint, Responsible for in process quality and inspection of press components & cabinet painting.
Engineer
Since 1983 to 1993.
Worked with Kelvinator of India Limited, (Automotive Division), Alwar, Rajasthan.
Area of Function: IQC (From 1992 to 1993)
Responsibility:
Worked as a Incharge of IQC Dept.
Responsibility of incoming material inspection & to establish the inspection standards & developments.
To solve Assly fittment problems due to bought out components.
To follow SQC Techniques, & 7-QC Tools.
Vender rating performance card implementation.
Area of Function: Warranty Cell Moped Divn. (From 1990 to 1991)
Responsibility:
Worked as Incharge of Warranty Cell
Started new warranty cell set up.
Organized warranty activities at works.
Co-ordination with Service & Marketing Deptt.
Free Service camp Co-ordination with Branches
Mechanic Training Center set-up done & Organized Trainings at Factory.
The Branch wise warranty claim finalization & acceptance guideline made.
Area of Function: Quality Audit Moped Divn. (From 1988 to 1989)
Responsibility:
To perform Moped audit and co-ordinate with corresponding.
Department to improve quality of Moped components & performance in all respects.
To implement the QC standards techniques & problem Solving techniques.
Area of Function: Vehicle Assly Moped Divn. (From 1986 to 1987)
Responsibility:
In charge Vehicle Assembly QC.
Responsible for finish good quality of Moped in all respect.
To solve the assly fittement problem with indigenous part & to take corrective action with related Dept.
Responsible all type of final vehicle testing & trials, e.g. Braking test, on road fuel test etc
Area of Function: Vehicle Assembly Scooter Divn. (From 1983 to 1985)
Responsibility:
In charge Vehicle & Engine Assembly QC. as Assistant Engineer.
Responsible for finish good quality of Scooter in all respect & PDI.
To solve the assembly fittement problem with related Department.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com