2012 - 2016 BE Electrical SND College Of Engineering And RC, Yeola .(Pune University)
2010 2012 HSC Swami Muktanand Jr.College ,Yeola (State Board)
2010 SSC Madhyamik vidya mandir,Rajapur (state Board)
SAP ERP – Material Management, Version ERP 6.0EHP 7
Python
MS Office, Excel, power point
Good interpersonal and communication skills
Associate Consultant
From May 2019 till date
Company profile - IT consultation firm and SAP Training institute offering online training & SAP class room training for different SAP
Job profile -
SAP ERP Experience of SAP S4/HANA, SAP ECC 6.0 IN MM MODULE with knowledge (MM Transactions, vendor master data, Material master data & All End user scenario) Proficient Knowledge about MM scenario and design of configuration of MM sub-modules.
Covering the complete range of all basic functionality of organization enterprise structure plant, purchasing organization, storage location, and purchasing groups. Assignments of all the enterprise structure each other attributes of material type and number ranges for material master, the output format of the material number.
Structures of Material Management, with Master Data, Vendor Master,
Material Master, Purchase info record. Settings for key fields in material master such as material group, basic material, and purchasing value key.
Creation of Master data for Material master, Vendor master and Purchasing Info Records.
Configuration settings for vendor master records.
Hands-on Knowledge ofP2P cycle, Service PO, subcontracting PO. Consignment PO. Framework PO/Blanket PO
Having Hands on Inventory Management(Goods receipt, Goods Issue, Stock Transfer,Consignments, Subcontracting.)
Release Procedures for purchasing documents, Purchase Requisition.
Definition of condition type, calculation schema, schema determination for pricing procedure.
Data Migration through LSMW tools, Mass Maintenance.
Strong analytical, problem solving, troubleshooting and multi-tasking skills.
Projects Undertaken:
Client: RIECO Industries Ltd.
Project Type: Implementation Project.
About Client: Founded in the year 1975, RIECO Industries is a leading project engineering and manufacturing company in India with a focus on delivering sustainable and reliable solutions to its customers across the globe in the domain of powder and bulk solids.With more than Five thousand installations in India and over 30 countries, we have proved our expertise in handling challenging and varied applications. With an experienced team of 200 plus people, we can meet
requirements of the most demanding projects.
Responsibilities:
Study AS-IS processes of client
Defining Organization Structure as per Business Process.
Prepare BPD documents & conduct BPD workshops Baseline Configuration as per defined KDS. FRICE list finalization based on Gaps identified Prepared Functional specification & test scripts Project documents review Support to project team for solving critical issues during different phases of implementation Carried out Unit Testing and training sessions for the users Carried out critical Z developments as per Gap List with technical team.
Handling Implementation project through Sol-man, managing documents in SOL DOC and mapping test scenarios in Test Plan Management Client: San gram Auto Components Pvt.Ltd About Client: San gram Auto component manufacturers of sheet metal
components, metal forming and fabrication of automotive components, such as Back Plates of Break assemblies, welded sub-assemblies etc. are committed towards customer satisfaction by offering best products at right time with competitive price, through continual improvement and interaction with the customer.
Project Type: Post GO-Live Support project.
Responsibilities:
Configuring Automatic account determination, MM-FI Integration.
Configuring release procedure for PR and PO New Plant Rollout configuration.
Configuration of MM Organizational units and assignment of the same to overall
structure.
Master data migration and validation, UAT, Integration testing.
Created a new condition type as per requirement and inserted it in existing pricing procedure.
Configuration of field selection for Material Master and Inventory Management.
Uploading of Master data through LSMW Technique.
Development of smart form for purchase order Created a new material group as per requirement
Created a new storage location as per requirement and assigned it to the existing plant
Handling Special procurement process like sub-contracting, Consignment, Service Generating Auto Purchase Requisition through MRP Run.
Functional Specifications for Couple of GST Reports and Coordinating with technical consultants
Production Engineer
From Feb 2018 Mar 2019
Company profile -
Manufacturer of Power & Distribution Transformers.
Job profile -
Handling complete shop floor planning and coordinating production scheduled processes on daily basis and achieve target Responsible for material requirement, delivery, and sustainability of product quality to customer
Checking daily production planning as per previous order date. maintain daily production report
Provides training session and guidance to team members to accomplish production goals.coordinating with senior and top management.
Graduate Engineer Trainee
From Mar 2017 Feb 2018
Company profile -
Silver line Electricals Pvt. Ltd
Job profile -
Completing all tasks set by the seniors and assisting wherever possible.
Observing existing strategies and techniques and offering suggestions for improvement.
Analyze technical data and specifications to determine the equipment needed for projects.
Working closely with staff to foster professional values and build good relationships.
Attending meetings and workshops.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com