B.Tech (Mechanical Engineering) G.R.D IMT, Dehradun, Uttarakhand (2017) 60.5%
Intermediate JV Jain Inter College, Saharanpur (UP Board) (2013) 63.8%
High School PD DDU KHS, Saharanpur (UP Board) (2011) 57%
Basic Software: Ms Office (Word, Excel, Powerpoint)
Engineering Software: Solidworks
Other: Good Understanding Of Internet And Related Technologies
Optimistic And Positive Attitude
Quick Learner With Multitasking Ability
Strong Teamwork And Collaboration Skills
Assistant Ppc In Charge & Team Leader
From :- 2021 To 2023 Till Now
Company Profile :- Design And Manufacture Of Brake Pads, Brake Shoes And Wheel Cylinders
Job Profile :-
Managed Production Schedules And Manpower Planning For Brake System Components.
Coordinated With The Quality Control Team To Ensure Adherence To Quality Standards And Specifications.
Supervised A Team Of Operators, Ensuring Alignment With Production Targets And Safety Protocols.
Generated Daily And Monthly Production Plans, Ensuring Optimal Machine Utilization And Alignment With Customer Orders.
Implemented Process Improvements To Enhance Throughput And Reduce Downtime, Leading To A 10% Increase In Production Efficiency.
Handled Inventory Management And Material Planning, Ensuring Smooth Operations And Timely Delivery.
Managed Documentation For Production Logs, Material Consumption, And Daily Reports To Ensure Accuracy And Traceability.
Achievements:
Reduced Production Lead Time By Optimizing Scheduling Processes, Cutting Down On Waste And Improving On-time Delivery By 15%.
Played A Key Role In A Team That Achieved A Significant Reduction In Defect Rates Through Improved Training And Process Monitoring.
Supervisor
From :- 2019 To 2020
Company Profile :- Labelling And Packaging Companies
Job Profile :-
Supervised Production Operations, Ensuring Alignment With Quality Standards And Process Protocols.
Managed A Team Of Operators And Performed Troubleshooting On Mechanical And Electrical Systems.
Coordinated With The Maintenance Team To Schedule Preventive Maintenance, Ensuring Minimal Downtime.
Implemented Safety And Quality Control Measures, Which Reduced Workplace Accidents By 20%.
Achievements:
Successfully Reduced Material Wastage By 12% Through Process Optimizations And Better Resource Planning.
Streamlined The Communication Between Various Departments, Leading To Faster Decision-making And Reduced Cycle Time.
To enhance my professional skills, working capacities, and contribute effectively to the organization with determination and commitment.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com