Bachelor of Engineering (Mechanical) Gujarat University, 2011
Higher Secondary Certificate - (Science) G.H.S.E.B., 2005
Secondary School Certificate - G.S.E.B., 2003
Team Leadership
Analytical Thinking & Planning
Problem Solving & Decision Making
Strong Communication Skills
Predictive & Preventive Maintenance
Condition Monitoring
Breakdown Maintenance
MACE Training on:
Root Cause Analysis & Why-Why
CAPA (Corrective and Preventive Actions)
Kaizen & Poka Yoke
Installation & Commissioning
Greenfield Project Management
TPM and 5S Implementation
Documentation & Reporting
Manpower Allocation & Safety Management
Vendor & Spare Management
Assistant Manager - Project & Plant Maintenance
From :- Feb 2024 Present
Company Profile :- Resin, Synthetic Rubber, And Artificial And Synthetic Fibers And Filaments Manufacturing
Job Profile :-
Lead The Planning, Scheduling, And Execution Of Maintenance Activities For Plant Machinery, Ensuring Increased Machine Uptime And Reliability.
Successfully Managed The Commissioning Of Machinery And Equipment, Including Vendor Visits And Pre-installation Checks.
Developed And Maintained Preventive Maintenance Schedules And Executed Breakdown Maintenance Activities.
Responsible For Tracking Project Progress, Material Availability, And Working Closely With Vendors For Smooth Project Execution.
Managed Iso, Iatf, And Legal Documentation For Audits And Ensured Compliance With Gpcb Regulations.
Assistant Manager - Maintenance
From :- Apr 2017 - Feb 2024
Company Profile :- Polypropylene Composite Material & Alloy Manufacturing Company
Job Profile :-
Played A Key Role In The Installation Of Extruder Lines And Utility Equipment For The Gujarat Plant.
Implemented Cost-saving Initiatives For Machine Spares, Achieving Savings On Oem Parts.
Increased Equipment Reliability And Reduced Downtime By Ensuring Robust Maintenance Practices And Efficient Manpower Management.
Project And Maintenance In-charge
From :- Feb 2014 Apr 2017
Company Profile :- Manufacturer Of Aac Plant
Job Profile :-
Successfully Completed Aac Plant Projects At Bhopal And Uttarakhand.
Managed Installation And Commissioning Of Plant Equipment For Major Projects.
Played A Pivotal Role In Increasing Operational Efficiency By Optimizing Machine Performance And Reducing Costs.
Awarded "Best Employee Of The Year" In 2016 For Outstanding Contributions.
Project Engineer
From :- Aug 2011 Feb 2014
Company Profile :- Draft-air (I) Pvt. Ltd.
Job Profile :-
Managed Installation And Commissioning Of Air Conditioning And Ventilation Systems For Various Projects.
Coordinated With Vendors And Suppliers To Ensure Timely Availability Of Materials And Equipment.
To work in a highly competitive and dynamic environment where I can leverage my skills and experience to contribute towards organizational growth and success. My aim is to carry out tasks with dedication and drive, ensuring excellence in every project I undertake.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com