Ref. No. : CA - 35917 - (Designer & Product Developer – with 16.3 years in Plastic Industry)

Education

B.E Mechanical Engineering at TAGORE ENGINEERING COLLEGE, VANDALUR (Anna University) with aggregate of 68% in 2005
HSC (State Board) at SRKM Boys Hr Sec School, Chengalpattu with 76% in 2001.
SSLC (State Board) at SRKM Boys Hr Sec School, Chengalpattu with 68% in 1999.

Skill Sets

Internal Quality Auditor for IATF
6 Sigma Green Belt
APQP /PPAP/ FMEA (AIAG VDA) / SPC / MSA
GD & T
Problem Solving Techniques

Work Experience

Assistant Manager
From -Sep13 to till Date
Company profile - manufacturing of sheet metal Automobile Body in White (BIW) parts, weld assembly& Chassis Assembly Process for Automotive

Job profile -
Programme quality for BIW & Chassis parts (RTB, FCM & LCA Assy) for FORD, RENAULT NISSAN, HMI & KIA from Phase 1 to Phase 5.
Process design verification & validation thro CPMP (Cosma Program Management Process).
Read across implementation during launch phase.
Drive and closure of PVP&R approval from OEM.
All Stamping & assy check fixture design approval and buy off.
Product characteristics controls establishment during launch phase.
Supplier development & PPAP for New Product.
Customer specific requirement implementation such as ASES (RNAIPL), Q1 (FORD), 5 STAR (HMI&KIA).
Heading weld quality lab Knowledge of weld destruct analysis and OEM weld standards.
Monitoring plant wide weld quality performance.
Customer complaint resolution for technical & process.
Shop floor QA Management.

Project Leader NPI
From - Oct10 to Sep13
Company profile - the leading manufacturer of Electric Vehicles

Job profile -
Conducting risk level assessment along with the CFT to check the feasibility of the project in terms of commercial, technical and production and communicating the same to the customer.
Review of customer specific requirements for new projects and deployment of the same during the course of the project.
Monitoring & tracking at different phase of the project and close the gateway of each phase on target date.
Try-out the designed section & carrying out tool trials at In-House.
Preparing Bill of Material for new products. Capacity analysis & inputs for Profit analysis.
Carrying out Engineering Change Note corrections & Implementation.
Value Engineering (VA/VE) for existing model parts like cost reduction, process integration, Line balancing, waste elimination, supplier integration etc.,

Engineer Engineering Dept
Mar07 to Jun10
JBM Auto System Pvt Ltd

Trainee Product Design & Testing
May06 to Mar07
Rane NSK Steering System Ltd.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com