Passed B.E. (Mechanical) in the year 1992
Seeking assignments in Operations / Production /Manufacturing / Continuous Improvement / Training & Development in a Growth Oriented Organization
Assistant General Manager
From Feb’16 - till date
Company profile- manufacturing of glass containers.
Job profile-
Improving Quality / Productivity / Reliability at manufacturing with continual improvements . Preparing , Updating & maintaining documents related to Production department. Imparting class room & on the job training to shift Engineers & workmen for continuous improvement in productivity. Scheduling material procurement plans & ensuring optimum inventory level . Monitoring discipline at the shop floor for an accident free & safe work culture. Conducting Internal Audits in various departments of the Organization. Initiating & Coordinating various SMP, EMP & QMPs of the Dept.
AGM – Production
From Feb’13 – Feb’16
Company profile- Leading glass pharmaceutical packaging for healthcare.
Deputy Manager – Production
From Jan’98 – Feb’13
Piramal Glass Ltd ., Jambusar
Job profile-
Worked with both EMHART (T-600 VLAN) & BOTTERO control systems , Electronic I.S. machines in “BLOW & BLOW” & “PRESS & BLOW” processes of bottle manufacturing. Well conversent with Forming of Foods, Pharma , Nail Polish & Perfumery Bottles in I.S. M/Cs.
Shift Engineer – Production
From June’96 – Jan’98
Hindustan National Glass & Industries Ltd.
Job profile-
There I had worked with Emhart electronic & drum type I.S. machines in “BLOW & BLOW” & “PRESS & BLOW” processes , with HE- 144 & HE- 81 type feeder mechanisms. During period of work over there, I was handling shift production activities
At Hindustan Aeronautics Ltd., Sunabeda, Koraput ( Role : Apprentice Trainee - CNC shop ) HAL is one of the Asia’s largest Aerospace companies involved in design , fabrication & assembly of Air crafts, Jet engines & Helicopters as well as their components & spares. There I had worked as a trainee in CNC-II shop. During training period , I gained knowledge in CNC programming, especially turning operations of turbine discs .
At Niranjan Construction Works, Mukhiguda , Kalahandi, Orissa ( Role : Site Engineer ) NCW is a company engaged in fabrication works. It was working under Orissa Construction Corporation, Mukhiguda & was engaged in Erection & welding of Penstock Pipe lines of Upper Indravati Hydro electric Project. There I had worked as a site engineer, looking after the erection & welding of Penstock Pipe lines.
At Konark Cylinders & Containers (P) Ltd., Bhubaneswar ( Role : Shift Production Engineer ) Konark Cylinder & containers (P) ltd. is a manufacturer of LPG cylinders . During the period of work over there I was supervising various processes of LPG cylinder manufacturing. The various processes under my supervision were Deep Drawing Press, Shearing , Blanking, Submersed arc welding, MIG welding, Electric arc welding, Heat treatment, Hydrostatic test, Shot blasting, Metallising, Valve fixing & Valve leakage tests etc.
Profile-
Have a strong Communication, Process & Quality oriented analytical Skill. Extensive experience in Glass Container Forming (Foods & Pharma & Cosmetics & Perfumery) , Design Modifications & repair of Mould equipment's , Inventory Control & Cost Optimization. Experience in Glass container Forming in both Type-III (Soda-lime Glass) & Type-I (Borosilicate Glass) Experience in implementing TPM /Six Sigma concept within organization. Experience in analyzing existing process, to identify bottle necks & executing result oriented measures for alleviating them. Experience in applying quality concepts such as TPM, TQM, GMP & 5 “S” for enhancing & sustaining output levels. Comfortable with computer environment & well conversant with Windows, MS–Office , Lotus Notes, MS –Outlook & SAP.