plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/1/2025 5:43:09 PM ________________________________________________________________________________________ RefNo: CA - 7663 Gender: Male Age: 46 Designation: Supervisor Highest Education Level: Masters - Degree Current Gross Salary: 4400 4400 /Annum Expected Gross Salary: 4800 4800 /Annum Notice Period: 45 Days Education Details: M.Tech In Mechanical Engineering From R.V.D. University, India In 2006 B.E. In Mechanical Engineering From Visweswariah Technological University, India In 2002 Skill Sets: Piping Engineering Execution In Sites Work Experience: 23.1 Work Experience Details: Piping Mechanical Superintendent Since February 2011 Company Profile: A leading producers of natural gas Job Profile: Close coordination with PMT & PID group of the Owner company with total coordination of Piping & Mechanical work of the project . Major and minor clarifications with the EPC and subcontractor companies regarding scope of work, new work extensions, revamping / up gradation works. Handling all sort of Piping Modification/ Revamping work with structural Modification and Structural Support Modification and connection to Mechanical Equipments (Static, Rotating, Pump, Compressor, Blower etc) Detailed Handling of Piping Work starting from P&ID checking to Mechanical Completion of Piping loops / systems including Hydro testing, Pneumatic testing, Punch list clearing (A, B & C category). Overall management and supervision of EPC/ Construction activities. Creating weekly and monthly progress for the management. Review of basic engineering data/documents of EPC contractors. Expedite procurement activities for timely delivery of materials at project site. Coordinate with discipline engineers for achieving Project objectives as per schedule. Reviewing of Change order and punch list, Final boxing up of equipments. Handing over of EPC Records to central file of refinery as permanent record from EPC contractors. Monitoring Flushing, venting, draining, cardboard blasting of lines after Hydro testing. Leak testing, Nitrogen Purging etc. Piping Mechanical Engineer April 2009 - January 2011 Company Profile: Refining & Petrochemicals Company in the Middle East Job Profile in above mentioned position includes: Preparation of Test Packages, detail coordination in punch list activities with details loop checking. Coordination between the office and site activities with detailed reporting Expedite Structural modifications of pipe Racks, Columns, Sleepers related to piping. Ensure piping work carried out in accordance with company rules, regulations, standards and permit to work procedures Chemical cleaning of piping systems including Oil Flushing, Acid cleaning, Rinsing, Passivity / Neutralization. Review work and inspection results to ensure compliance with EPC Contract requirements. Interface and coordinate with Project Field Engineering and QC Section. Monitor and ensure the correction of non-conformance report items and other issues supporting QA/QC compliance Review the construction sequence/logic, work plan/procedures, pre-task planning and methods statement to ensure comprehensive feasibility and safety, Push up the contractor for speedy work, guide & assist them to achieve the target in time Piping Mechanical Engineer Nov 2008 - April 2009 Hyundai Heavy Industries, South Korea Project in Jubail, Saudi Arabia Job Profile: Review Drawing i.e. P&ID and ISO metric and BOQ in Isometric reviewing and Planning for fabrication until Mechanical handover and Pre-Commissioning of Piping work. Detailed planning of shop and field joints with ISO metric Drawing, and marking of loops and sequence of proceeding further for the completion of the erection and completion of the line . Monitoring and coordinating Tie-in works in Piping Battery limits and in other major junctions. Piping Mechanical Engineer Dec 2006 - Sept 2008 Toyo Engineering Corporation (TEC ) Japan Project: South Pars Gas Development Project, Iran, a Joint Venture of Toyo Engineering, Japan, DAELIM, South Korea, Japan Gas Corporation JGC, Japan. Job Profile: Review Drawing i.e. P&ID and Isometric and BOQ in Isometric reviewing Provide Company representation in monitoring and coordinating the site activities of Contractor and its sub-contractors. Review safety standards in the site and issuing work-permits depending on the nature of job e.g. hot work, cold work, naked flame, confined space, need of mechanical / electrical/ process isolation. Reporting on the construction activities, progress, and areas of concern and mitigating actions. Prepare for and participate in weekly construction review meetings. Monitor and assist the Contractor and sub-contractors in the implementation of site specific SHE- Safety, Health and Environment program, emergency response and evacuation drill programs. Participate in incident/accident investigation and prevention of recurrence. Provide assistance and direction in the Mechanical Completion, Pre Commissioning and Start-up activities of the plant working with all parties to facilitate these activities. Preparation of Non availability of material list for the completion, Performing Loop / Line check Project Piping Engineer, Mechanical April 2006 - Dec 2006 Punj Lloyd Limited, India ( PLL ) PROJECT : LNG RGPPL Enron Power Project, Ratnagiri, In Maharashtra which was Joint Venture of Whessoe, UK. Job Profile: Detailed Site Supervision, Structural modification of Pipe Racks, Attending progress review meetings with sub contractors and Clients Inspecting Painting and Grid blasting of Pipes prior to the fabrication and erection and checking of Dry Film Thickness ( DFT ) Attending the daily and weekly Progress review meeting with client/ subcontractor / JV management staff like Discipline Const. Manager, General const Manager, Area Superintendent, Site Manager and Project Directors etc, update them with the current site status and reports. Mechanical Engineer April 2002 ? March, 2006 Stewarts & Lloyds Of India Ltd, PROJECT: PX-PTA Project At Iocl Panipat Refinery & MMPL Pipeline Project Of BPCL, Bijwasan Oil Terminal, DELHI. Job Profile: Detailed Site Supervision. Handling P&IDs, Isometric drawings , Fit Up Report, Traceability Reports, Welding Visual reports. Attending the daily and weekly Progress review meetings . Future Goals: To be employed in a company where my technical expertise in the field of Engineering could be utilized for mutual benefit as a team player and team leader requiring people management and organizational skills combined with extensive knowledge and experience of the oil and gas industry. ________________________________________________________________________________________