plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/1/2025 5:44:12 PM ________________________________________________________________________________________ RefNo: CA - 6657 Gender: Male Age: 43 Designation: Engineer Highest Education Level: Diploma Current Gross Salary: 200000 200000 /Annum Expected Gross Salary: 300000 300000 /Annum Preferred Location: India Notice Period: 30 Days Education Details: Diploma in Plastic Engineer from Government Polytechnic, Valsad in March 2003 - (62%) S.S.C - Gujarat Secondary Education Board, Gandhinagar in March 1997 -72%) Skill Sets: Solves the problems of production related of injection moulding M/C. Man power handling, assigning them relevant work to get maximum output. Making sure to achieve my team targets on daily basis. Responsible for solving daily break down problems, preventive maintenance work as per the schedule. Handled utility related work, e.g. cooling tower, DG sets, pump rooms and air compressor. R take trials of all new molds as per PMDC calculation Looking after mold changing proc responsible for solving daily break down problems, preventive maintenance work as per the schedule. Handled utility related work, e.g. cooling tower, DG sets, pump rooms and air compressor. Ess as per the company norms to decrease the rejection % and to get maximum productivity. Work Experience: 23 Work Experience Details: Production Engineer Since June 2006. Company Profile: Manufacturer and exporter of plastics houseware, thermoware and furniture. Key Responsibilities: Solves the problems of production related of injection moulding M/C. Battenfeld ?440, 650, 850 tons. Hwa ? 800 and Hwa- 450 ton Polo-350 ton M/C Sprint ?350, 450, 650 ton M/C Man power handling, assigning them relevant work to get maximum output. Making sure to achieve my team targets on daily basis. Responsible for take trials of all new molds as per PMDC calculation Looking after mold changing process as per the company norms to decrease the rejection % and to get maximum productivity Production Eng. From Sep 2005 to June 2006 Wim Plast Ltd (Daman) Key Responsibilities: Solved production related problems of injection moulding M/C, and any type of maintenance related problems. Sph ? 400, 650 and 850 ton M/C (Windsor). Sumitomo ? 650 tons M/C. Proper handling of man and machines. Achieve production target with quality Maintenance Engineer From May 2003 to August 2005 Mutual Industries Ltd, Dadra. (Silvassa) Key Responsibilities: Solved the maintenance related problems of injection molding machine Handled following M/C. Windsor ? SP 130, 180, 230, 300, 400, 600, 800, W-1100, W-1300 tons of machines. Sigma ? 400 M/C. Toshiba ? 850 M/C. Engel ? 600, 800, 1100 ton M/C. Responsible for solving daily break down problems, preventive maintenance work as per the schedule. Handled utility related work, e.g. cooling tower, DG sets, pump rooms and air compressor. PROJECT DETAILS Ferromatic Milacron (India) Ltd Trainee July 2002 to January 2003 Project Objective: Testing and assembling of machines Mutual Industries Ltd, Dadra. (Silvassa) Trainee Dec 2000 to June 2001 Project Objective: Understanding the basic knowledge of Injection moulding machine, and learned about the process of machine Future Goals: My short term goal is place in reputed industries where i can all my knowledge and skills are used extensively. My long term goal in my life is to reached where i can handle whole system of the company and give more output for the company ________________________________________________________________________________________