plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 5/9/2025 8:07:33 PM ________________________________________________________________________________________ RefNo: CA - 4903 Gender: Male Age: 48 Designation: Junior Executive Highest Education Level: Diploma Preferred Location: Anywhere Education Details: Diploma in Mechanical Enginnering ITI (NCTVE), Fitter pass with 68 SSC (10TH) Pass with 67 Skill Sets: Shutdown (Scheduled, Unscheduled & Emergency) activities for replacing Polymer Packs, Quench Screen, Radial Quench, Delay Quench etc. Change of Throw Down Air Hose Pipe, Finish Pipe (Tube), Air Cylinder, etc. Replacement of Gaskets of Radial Quench, Delay Quench, Quench Screen, Flange etc. Change of Couplings like Finish Pump Coupling, Waste Line Coupling, and Impact Tool Air Line Coupling Helical, Finish Motor, Pack Pre Heater Motor `V` Belt etc. Work Experience: 30.6 Work Experience Details: Jr. Technician cum Operator (Jr. TOP) 29th May 1996 to till date. Presently working with leading company in the continuous process plant of POY (Partially Oriented Yarn) in the production department Job Profile Well acquatinted with String up Tool, vacuum to be used in the operation of POY Winding Machines (Pneumatic System). Threading yarn quench floor to winder m/c. Shutdown (Scheduled, Unscheduled & Emergency) activities for replacing Winder m/c., Traverse Guide, Feed wheel, Ceramic Guide, CR2 jet, etc. Alignment and positioning of Chucks, Sensors, Cr2 Jets, Air Jet, Limit Switch, CATT etc. Change of Winder Machine and Repairing. Attending Leak, Vibrate And Trip Problems. Change of Cam Roll, Feed Wheel Motor, Feed Wheel, Let Down Roll, Cam Roll, Cam Roll Timer Belt, Cr2 Jet Air Pipe (Plastic & Aluminum), Waste Jet Air Pipe, etc. Wiping packs for get quality production. Shutdown (Scheduled, Unscheduled & Emergency) activities for replacing Polymer Packs, Quench Screen, Radial Quench, Delay Quench etc. Change of Throw Down Air Hose Pipe, Finish Pipe (Tube), Air Cylinder, etc. Replacement of Gaskets of Radial Quench, Delay Quench, Quench Screen, Flange etc. Change of Couplings like Finish Pump Coupling, Waste Line Coupling, and Impact Tool Air Line Coupling Helical, Finish Motor, Pack Pre Heater Motor `V` Belt etc. Alignment and positioning of Chimney Wing, Chimney Wing Extensions, Redial Quench, Finish Pump, Finish Tip Cover, etc. Hot water flushing in finish line and finish tank. Preventive maintenance of De-super heater Nozzle, Cleaning Critical Air Filter, Replacement And Cleaning Of Its Drum, Pump Block Cleaning, etc Change of Shear Pin, Shaft Of Metering Pump, Metering Pump Coupling, Metering Pump, Critical Air Filter, etc. Replacement and poisoning of Insulated Pad and Insulated Damages Block Cover (as per require). Lansing machine operating in PT (Physical Testing) lab. to check of yarn quality Tagging to all changed items(part) and kept its proper area(place) for Maintenance. Working with automatic winder I shouldered the following responsibilities @ Gujarat narmada velley fertilizer ltd. Working in coal handling plant. Working in ash handling plant. Working in boiler plant with fuel injection handling system. Working in captive power plant. Working in water treatment plant Working in water dematerialized plant Apprentice Boiler Attdent For 17 Months Worked with Gujarat Narmada Velley Fertilizer Ltd ________________________________________________________________________________________