plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 24-08-2026 20:36:00 ________________________________________________________________________________________ RefNo: CA - 41471 Gender: Male Age: 41 Designation: Senior manager - Manufacturing excellence Highest Education Level: Graduate - Degree Preferred Location: Tamilnadu Education Details: B.s (Engineering Technologies), Bits Pilani, Rajasthan 2010 Skill Sets: Proficiency In Erp-sap (Implementa?on & Training Of Sap-pm Module (Crea?on Of Purchase Requisi?on, Brake Down No?fica?on & Order) From October 2005 Familiar With Autocad, Conversant With Ms Office Work Experience: 23.5 Work Experience Details: Senior Manager - Manufacturing Excellence From :- March 2026 To Present Company Profile :- The Company Provides Vertically Integrated Manufacturing Solutions For Marquee Domestic And Global Oems Across The Automotive And Industrial Sectors Manager M2 ? Plant Manufacturing Engineering, Projects And Maintenance From :- January 2024 ? Mar?25 Company Profile :- A Premier Indian Manufacturer Of Cast, Machined, And Sub-assembled Aluminum Die Castings Senior Manager(sr.lead) ? Manufacturing Excellence ,Me & Plant Maintenance From :- Aug 2022 ? October 2023 Company Name :- Uno Minda Limited Senior Manager From :- 2003-augest-2022 Company Name :- Sundaram Clayton Ltd Diploma Engineer-production From :- Apr-03 To Aug-03 Company Name :- Royal Enfield Pvt Ltd Job Profile :- Qms Procedure Made For Manufacturing Engineering And Maintenance Process Based On Tqm And Lean Concept. Qsp Was Implemented Effectively At Shop Floor By Educating The Team For Pdca,qc Tool And Sustained For Continual Improvement. As A Part Of Sdca, Improved The Shot Blasting Machine Output 33% By Modifying The Jig To Accommodate 155 Instead Of 120 Per Load Complete The Benchmark Study Among The Various Supplier For Die Casting And Injection Moulding ,Select And Install The Idra,ube,zitai,yizumi,toshiba,shanji,tbc And Hmt Make Machines. Die Casting Machine Down Time Reduced From 1250 Hours To 624 Hours In The Period Of 4 Months By Doing The In Depth Root Cause Analysis By Adopting Tpm Approach. Repair And Maintenance Cost Were Reduced By 1.5cr From 2.5 Cr By Adopting Roti Approach. Energy Consumption Reduced From 16.5l Units Into 15 Lakhs Units Per Month By Roti Approach. Increase The Conveyor Speed By Changing The High Rpm Motor (1400 To 2100 Rpm)and Plant Output Increased From 29,000 Into 32,000 Numbers ?Conveyor Speed Increased From 1.8 To 2 Meters /Minute - Breakthrough Kaizen Had Awarded. Implement The Heat Recovery System From Compressor Outlet To Paint Shop Hot Water Tank.existing Lpg Fuel Was Replace With Heat Recovery System And Thereby Fuel Saving Was 58kg/day. Cost Saving Is Rs 13,57,200/-per Annum. Install The Humidity Sensor And Interlock With Alarm In Paint Shop To Improve The Surface Finish Of The Component By Avoiding Moisture Entry In The Air Line. Implement The Centralized Vcs Alarm(buzzer With Lamb) For Critical Process Parameter At Paint Shop To Adhere The Process And To Ensure The Product Quality.i.e ? Air Pressure ,Oven Temperature, Quality Of Air By Monitoring The Temperature.. As Continual Improvement, Increase Critical Machine Output By Implementing Best Foundry Practices (Ref;nadca Standard) Plan Important Spares And Handle Inventory Management Enhance The Machine Availability By Qc & Sit/ Cft ? Projects And Dwm Practice And Implement Tpm And Ts Concepts Handle Plan And Launch Of Preventive Maintenance Allocate The Manpower To Different Stage In Assembly Planned & Launched Cell Balancing Handled Spares Maintenance Ensure Vehicle Quality. ________________________________________________________________________________________