plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/1/2025 5:53:30 PM ________________________________________________________________________________________ RefNo: CA - 30920 Gender: Male Age: 30 Designation: Assistant Engineer Highest Education Level: 0 Notice Period: 30 Days Skill Sets: KEY SOFTWARE SKILLS Operating Systems : Windows 98, 2000, Win8 MS Office Tools : MS-Excel, PowerPoint, word Work Experience: 10.4 Work Experience Details: Assistant Engineer From 23 January 2015 to till Now Company profile- Manufacturer of hvac systems, waste recycling systems & plastic moulding Job profile- Shop floor handling, Manpower handling, Material handling, Production planning, Part moment, Online assembly, DIS closing, SMP revised, Problem solving with 7QC tool, Audit Document Cycle time reduction, Rejection reduction, increase Efficiency & Utilization New comer training, 5S maintain Assembly Feasibility & Process Flow, Process set up for new mould, Process & Time study for moulding process, Involve in analysis of Poke - yoke and effectiveness of the same, New mold trail/Analysis Support to Maintenance, Tooling, Planning & Quality Development team Supporting during PM, and analysis the problem, Define tooling problem, During plan making playing a big role for PPC team, Part running as per required Quality standard. Project handled: Mc handling JSW 850 ton,Haitian 2400ton, Nissei 2000 ton,Engle 1500 ton. Nigata 450 ton,Toshiba 450ton Increase of Productivity & reduction of part weight in scientific molding Reduction of Mould change time using Quick mould change system. Implementation of one man 2machines concept. Standardization of Mould & machine for its auxiliary equipment's (Locating Ring & Cooling nipples). Reduction of mould change over time by allocating Specific machine for specific products. To identify the root cause of problem through 7QC tools for reduction the rejection. PROFESSIONAL SUMMARY 5 years dynamic experience in the field of Automobile Industries which includes Production & Process setup of Plastics parts.In Process &Production Engineering having 5 years experience With apprentice Specialized in Production, Rejection reduction & Process setup, Good Knowledge in Shop floor handling, Specialized in Manpower handling & Material Handling for Injection molding, Good knowledge for new mold trail & Process setup New comer training, Playing important role in plan making for production, Future Goals: To be associated with a professional organization contributing myself to the Production Process, & Technological excellence of the company through long term mutual relationship. ________________________________________________________________________________________