plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 5/1/2025 9:54:01 AM ________________________________________________________________________________________ RefNo: CA - 30356 Gender: Male Age: 64 Designation: Plant Head. Highest Education Level: Diploma Notice Period: 30 Days Education Details: Diploma in Mechanical Engineering from B & B Polytechnic, Vallabh Vidyanagar, Gujarat in 1982 with 71% Skill Sets: SKILLS Critical Thinking and Problem Solving Planning and Organizing Co-Ordination and Control. Leadership Decision Making Negotiations Team Building Conflict Management. Time Management & Result Oriented. Work Experience: 41.8 Work Experience Details: Plant Head. From:2021 To Till Date Company profile- leading Manufacturer, Supplier of Elliptical Heads , Hemispherical Heads With Straight Flange, Torispherical Heads Head (Manufacturing) From May 2018 to April 2019 Company profile- Fabrication/Painting/Assembly/Commissioning &Trial/Final Inspection/Packing & Despatch.Total Activity are operated through ERP System From July 2017 to May 2018 was Working with Zeppelin System India Pvt Ltd As A Project Manager.Looking After Fabrication of Pressure Vessels, Heat exchanger,Storage Silos Sheet Metal Fabrication, Tanks Heavy & Light Structure Fabrication. Also Looking After All Procedure From QAP to Final stage of Inspection from TPI.Also Responsible for Quality Check off all Fabricated. Items. July15 May17 - ISHAN EQUIPMENT PVT LTD. Vadodara. (ASME U STAMP, NB Certified) as Dy General Manager (Production/Planning & Control) Job profile- Looking After Manufacturing of Pressure Vessels, Column, Tank, Filter, Casing, Separator, Bunker, Hopper , Fired Heater etc.Also Responsible for Planning, Procurement, Vendor Development, Co Ordination with marketing , Design, Manufacturing to meet deadline of Completion of Job to Satisfy the Customer .Also responsible for Manufacturing of Shell & Tube type Heat Exchanger. Jun 09 Apr15 - McNally Sayaji Engg. Ltd. (ISO 9001/2008), Vadodara as a Deputy General Manager. Role: Administering Fabrication activity of Jaw Crusher (single and double toggle), Impactors, Hammer Mill, Roll Crushers (Toothed and Smooth), Vibrating Screen, Vibrating Feeder, Mobile Crushing Plant, Cone Crusher, HPA screen, Apron Feeder and Conveyors. Managing Assembly, Testing and final dispatch of all above fabricated equipment's. Leading a workforce (sub-contractors & on role) on daily basis to achieve set target. Aug 08 May 09 - Mech Tech Incorporation, Manjusar, Vadodara as Senior Manager Role: Handled Fabrication of Jaw Crusher, Vibrating Screen & Feeder. Managed fabrication works of heavy jobs for M/s Elecon like rail table, Mast, Bucket wheel boom and supporting structure. Anchored smooth erection and commissioning fabricated equipment's. Ensured high quality of all production and minimized scrap level to minimum possible Feb 07 Jul 08 - KHS Machinery Private Limited (ISO-9001-2000 &14001-2004), Ahmedabad as Sr. Manager Manufacturing Role: Conducted assembly and erection & commissioning of Filling & Packaging machinery. Dec 99 Feb 07 - Kabra Extrusion Technik Limited (ISO-9001-2000) with Batten Field Collaboration in Twin Screw PVC Plant as Deputy General Manager (Service) Role: Fabrication, Assembly, Processing, servicing of single and twin screw extrusion machinery.Experience in PVC & HDPE Pipe Processing. Feb 96 - Dec 99 - Kilburn Engineering Limited, Vadodara as Deputy Manager Production Role: Fabrication of pressure vessels, Heat Exchangers, Rotary, Tea Dryers and Industrial Fan. Oct 94 Feb 96 - TLT Engineering Private Limited, Ahmedabad as Deputy Manager Role: Fabrication and assembly of Industrial Fan e.g.; ID Fan, FD-Fan and Exhaust fan. Oct 82 Oct 94 - Elecon Engineering Company Limited, Vallabh Vidyanagar as Senior Engineer Role: Fabrication of Stackers and Re-claimer includes. Under Carriage, Upper Carriages, Rail travel Mechanism (Boogies), Mast, Bucket Wheel Boom, Bucket Wheel, bucket, Wagon Tippler, Rail Table, End Carriage, Roller Screen and crawler. Fabrication of Ring granulator, Roller Screen and Vibrating Screen. Assembly of all above equipment's. Major Achievements Fabrication Cycle Time Reduction Cost Reduction in fabrication of EH Rotor, vibrating screen and HPA Screen, Reduction in Repeated Customer Complaint through root cause analysis. Productivity Improvement through in depth process analysis. In depth Training to contract people. Present CTC..1500000./PA OVERSEAS ASSIGNMENTS Deputed to Thailand for undertaking erection & commissioning of Thermal Power Plant at Elecon Undertook troubleshooting of Processing of Twin Screw PVC Pipe Extruder at Muscat two times from Kabra Extrusion Ltd. Training Attended ISO 9001:2008 Trainings ISO Audit Customer Satisfaction PVC testing. PROFILE SUMMARY A seasoned professional experience over 30+ years in Production Operations, Project Engg, Assembly Unit Operations,PVC /HDPE Pipe Processing,Maintenance, Erection & Commissioning, Quality Assurance & Fabrication in varied industry segments. Proficient in handling production operations for manufacturing of machine equipment and ensuring quality service & timely completion of the projects Adroit in administering overall operations & maintenance activities in plant with a view to enhance the operational efficiency of operations, eliminating obsolescence and achieving cost reduction through vendor development, curbing rework & rejection, materials management and inventory control Thorough understanding of the implementation of SOP (Standard Operating Procedures); and adopting TQM approaches like Kaizen, and 5s, Lean Manufacturing. Exposure in fabrication of; Pressure Vessels, Heat Ex-changer, Rotary Dryer, Industrial Fan. Sub-contracting of Fabrication of Heavy Machinery, Material Handling Equipment and Stacker Reclaimer, Conveyer. Material handling Equipment like Crane (up to 150 MT), Jaw Crusher, Hammer Mills, Imp-actors, Roll Crushers, Vibrating Screens and Cone Crushers, Mobile Crushing Plant and Construction Equipment. Rich experience in building teams, labour management, optimizing machine & man-hours to achieve monthly production targets Possess strong leadership & coordination skills with decision-making abilities. Future Goals: JOB OBJECTIVE Seeking senior level assignments in Production/Project Management and Fabrication Operations and with an organisation of high repute Industry Preference: Machine Equipment sector ________________________________________________________________________________________