plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/10/2025 2:43:36 AM ________________________________________________________________________________________ RefNo: CA - 29268 Gender: Male Age: 36 Designation: QA/QC Engineer (Mechanical) Highest Education Level: Diploma Preferred Location: Purba Medinipur Notice Period: 30 Days Education Details: Diploma Mechanical Engineering. From Rajasthan Vidyapith University In 2016 Rajasthan Vidyapith Of Technical Education, India Skill Sets: A very experienced mechanical engineers with over 1 years invaluable experience of successfully overseeing and competing projects form conception to completing. Having a proven ability to improve efficiency by pending solution to complex customer problems all to tight work schedules currently looking for a suitable mechanical engineering position with a progressive manufacturing company willing to relocate of necessary. Work Experience: 8.3 Work Experience Details: QA/QC Engineer (Mechanical) Since October 2016 Job Profile : Test report (C.M.T.R.) when purchased, the proper storage, and the system on controlling and distributing the electrode Monitoring and inspecting the prefabrication works by the contractors including the inspection of incoming materials, material handling, heat number transfer, Fit-up, welding activities, Post weld heat treatment (PWHT) of welding joints, hardness test, PMI (Positive material identification), reinforced pad test, Orientation and Flush grinding of orifice flanges. Witnessing and monitoring the required NDE(RT,UT,DPT,MPT) has been covered as per the project specification. Monitoring the QA/QC Documentation of the contractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements. RT film Interpretation Inspecting the painting works done by the contractors on the fabricated pipe spools. Make sure the Pipe spools are properly covered with the end caps and safely transported to the site without any damages. Monitoring and inspecting the erection works by the contractors including piping, welding and insulation and also co-ordination with contractors for the quality issues and issuing NCR?s when non-conformity activities were noted by the contractors. Welding surveillance prior and after welding. Inspect joint preparation, joint configuration and cleanliness. Verify use of pre-heat as specified, and the use of approved welding procedure specification. Visual examination of root passes for proper procedure, penetration, undercut, cracks, slugs and porosity. Check completed joints for excessive reinforcement, and other surface irregularities. Ensure that welders use assigned identification stamps. Reviewing Line history sheet and ensure that all required NDE examination shall be performed prior to final system hydro testing unless otherwise specified by engineering. Ensure satisfactory identification of materials, proper protection of piping and fittings. Verify proper size and schedule of pipe, rating of flanges, proper flange face and fittings. Inspect piping just before erection to verify that interior is clear of foreign materials. Check edge preparation and fit-ups to verify that areas to be welded are free of contaminants and that fit-up is within tolerance. Verify that all PMI of material has been performed per specification. ? Check flow direction arrows on valves; verify that the properly identified valves are installed in accordance with the flow diagram. Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details. Check and assure that all joints are exposed for examination during pressure test. Ensure that isolation or disconnection of equipment not to be tested. Check vents are open when filling and draining lines. Summary of Experience: Conversant with code and standard and project specification such as ASME/ANSI B31.1, B31.3, ASME sec II ,V,VIII,IX., API 1104, AWS D1.1 Preparation of Customer quality plans in various components. Prepared WPS, PQR & WQT as per AWS, ASME Sec IX & B31.1 Witnessed & Monitoring PQR & WQT as per AWS, ASME Sec IX & B31. Inspect filler materials and check its documents, to ensure that the proper electrodes are in accordance with the approved welding procedures. Check the typical certified material Summary of Experience: Conversent with code and standard and project specification such as ASME/ANSI B31.1, B31.3, ASME sec II ,V,VIII,IX., API 1104, AWS D1.1 Preparation of Customer quality plans in various components. Prepared WPS ,PQR & WQT as per AWS, ASME Sec IX & B31.1 Witnessed & Monitoring PQR & WQT as per AWS, ASME Sec IX & B31. Inspect filler materials and check its documents, to ensure that the proper electrodes are in accordance with the approved welding procedures. Check the typical certified material Witness final pressure tests, including verification that pressure gauges have adequate dial range and is calibrated. Confirm repairs, re-testing and re-inspection in accordance with specifications. Ensure blinds are removed and correct gaskets are installed. Confirm that instrument-tubing connections are reconnected. Ensure removal of hanger shipping bolts. Check that the pipe supports and hangers are completed and ready for operation, Verify proper insulation and installation. Painting and insulation inspections from surface to final visual inspection of the equipments and pipe lines. To assist the Site Superintendent and coordinate the Supervisors activity, carry out and implement the QA/QC program, arrange and conduct meetings under the Site Superintendent direction. Format and encode QC data sheets, inspection forms, and other QC documents as per Field Quality Control Manual suggested forms into the computer. Preparing the QA/QC Dossier for the project Assist document turnover and transmittal during project completion ? Career History:- Involved in the examination, development as well as testing of mechanical equipment and tools. Responsible for providing engineering support for work shop activities to ensure that components and equipment?s is maintained and refurbished correctly. Making sure all safety precautions are taken. Carried out safety test and recorded results on mechanical equipment and system and recommending improvements. Regular making dimensional orientation and material checks and comparisons. Responsible for the plant and equipment maintains and replacement of worn out parts. Having to scrutinize technical mechanical problems and follor correetive procedures to figure the problem and avoid re-correction. Having to scrutinize technical mechanical problems and follows corrective procedures to fix the problem and avoid re-currency. Explaining technical problems to non technical colleagues. Carrying out staff appraisals. Prepared monthly reports for senior managers. Involved in the design of new machines and equipment, whist at the same time taking accounts of cost, availability of materials, strength and maintains requirements. Supervising the smooth operation of the company manufacturing plants Professional Experience Able to adapt computer program solution improve efficiency and effectiveness, organization records, and compiling reports. Experience of using computer aided design systems and related software. Have previously worked with multinational and multi skilled crews. Experience of designing cost effective and practical mechanical equipment modification to help improve safety and reliability. Able to adhere to engineering principles and techniques. Knowledge of considering time constrains like safety, cost and environmental issues. Ability to evaluate and test theoretical designs. Job Profile Piping as per ASME B31.3 & B31.1, Pipeline as per API 1104, Pressure Vessel as per ASME SECTION VIII for Refinery and Oil & Gas Construction projects. Material- Carbon Steel(A106,API 5L, SA 105 & SA516),SS(SA312 & SA240), Duplex stainless steel(SA790), Alloy steel (SA335 GR P91, P92, P22, P11, P12) Heavy Structural Fabrication & Erection ________________________________________________________________________________________