plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/17/2025 2:39:15 AM ________________________________________________________________________________________ RefNo: CA - 25833 Gender: Male Age: 58 Designation: Manager Highest Education Level: Masters - Degree Current Gross Salary: 1000000 1000000 /Annum Notice Period: 30 Days Education Details: MBA in Project Management (Online) From California University in 2015 BE (Electrical) From College of Engineering, Karad Shivaji University, Maharashtra in 1988 Skill Sets: Maintenance/Engineering at Steel Pipes/Rolling Mills/Packaging Industry Qualified Internal Auditor: ISO 9000 by Dubai based Texas Management Services Change Agent Collaborator Communicator Communicator Thinker Work Experience: 36.9 Work Experience Details: Maintenance Manager Since Sept 2016 Company Profile: It is a five layer barrier film maker with Rotograve 8 colour printing and Slitting. Job Profile: Planned and effected Preventive maintenance for Heaters, Compressors, Chillers Installed new 300 KVA UPS for power stability Initiated up-gradation of equipment's for Heater controls. Improved edge cutting at Slitter unit adjusting Camera Controls Assistant Maintenance Manager: Mar 2011 to Apr 2016 Electrical Section Head : April 2009 to March 2011 Electrical Engineer/Supervisor: Mar 1996 to Apr 2009 Company Profile : Manufacturing and marketing of welded steel pipes for Oil and Gas, Structural and commercial utilization with sizes range from 6 to 48 inch. Job Profile : Planned & effectuated preventive maintenance schedules of various equipment to increase up time and equipment reliability . Conducted meeting on daily basis to keep a track of repetitive downtime and prepared monthly reports for the same Developed project baselines; monitored & controlled projects with respect to cost, resource deployment and time over-runs Maintained: Stock of electrical & electronic spare parts ISO related documents Managed the workmen for achieving the periodic efficiency and production Ascertained specific training needs of subordinates and accordingly arranged training programs on maintenance & troubleshooting activities Created procedures for preparation & implementation of programs within all areas of safety, health and environment Led Maintenance Department; reported to Plant Manager (In-charge of three plants) Undertook installation & commissioning of: Full Body Ultrasonic Testing Machine supplied by Sofratest France Strip Ultrasonic Testing Machine with 52 probes Box End Hydro Tester used for testing threaded pipes 250 TON Chilling Plant of carrier Reduced downtime by 03% through measures such as Yearly Planned Shutdown. Successfully executed plant expansion/modification/ upgradation projects such as : 52 Probe Strip Ultrasonic testing machine supplied by Sofratest France. Box Hydrotester machine from YoungIL Korea for testing Threaded Pipes. Installation of 300 Ton Chiller unit from Carrier USA. Installed new Pipe Galvanising unit . Electrical Section Head April 2009 to March 2011 Job Profile Spearheaded team encompassing 3 Electrical Engineers & 15 Electricians; reported to Plant Manager Anchored procurement & commissioning of: Edge milling and pipe cut-off machines 3.5 MVA Transformer and panels for the Coating Substation. Enhanced welding processes for the X65/X50 Grade Welding and Seam Annealing Process to facilitate better seam normalization at steady temperature Successfully steered development of Computerized Preventive Maintenance System which resulted in reduction in downtime . Upgraded NDT equipment provided by GE Technologies, Germany (Originally Krautkramer) Executed Annual Maintenance for Medium Voltage Electrical Systems of the plant. Electrical Engineer/Supervisor Mar 1996 to Apr 2009 Job Profile : Identified scope for modification in Tube Mill Finishing Mill and 3LPE Pipe Coating Mill Increased efficiency of HF Welding Machine with the help of Thermatool Technician Replaced: Spring Activated Contact Tip Pressurizing Unit with Air Pressure Cylinders which resulted in improved Quality of welding and life of contact tips. HF Welder PLC from Telemecanique (old version) to Allen Bradly PLC 5 Upgraded Seam Annealing Units by interchanging Thermatool Narrow Width Inductors with Ajax Tocco US Manufactured Wider Inductor Heads Assistant Manager Electrical March 1992 to March 1996 Company Name : Ispat Industries Job Profile : Reported to GM (Maintenance) Drove maintenance team of eight employees. Ensured procurement & installation of state-of-the-art Yaskawa U-84 PLC System with control desk, operating graphics and remote operation facility delivered by L&T Automation Division for the Raw & Product Material Handling System of the plant Led installation & commissioning of: 5 MVA Material Handling Substation, Motor Control Centers with ACB Starters for motors up to 300 KW and 2 Siemens 3.3 KV Switchgear Units for Dust Collection Motors 5 Nos. 110 KW AC Motors for 5 MVA the state-of-the-art Jetty Substation Played a key role in design & installation of: PLC System and Simodrives for Barge Unloader System at the Jetty PLC for the Elecon Stacker Reclaimers Drives and Raw Material Handling System 2 MVA Power & Distribution Transformers 500 KW heavy duty AC Motors Project Handled: Title:Greenfield Sponge Iron Project value: INR 1000 Crores Technology: Supplied by Midrex USA Shift In-charge / GET March 1988 to Mar 1992 Company Name : Nippon Denro Ispat Limited Job Profile : Undertook maintenance of: Electrical & electronic machinery for 6-Hi Hitachi Cold Rolling Mill and troubleshot issues using Hitachi PLC Batch Annealing Furnaces 220KV Switchyard Battery systems. Facilitated preventive maintenance schedules for EOT Cranes and 3000 KW DC Motor Drives Resolved critical rolling mill issues of strip breakage using magnetic detectors & sensors Training Midrex Technology Training with Sponge Iron Plant, Caribbean Ispat Limited, Trinidad and Tobago Sinumerik 840D and Simodrives 611D Drive Systems and Hot Trial Test for Milling Cutoff Machine, SMS Meer Monchengladbach, Profibus Communications Technology and Siemens S7 PLC Training by Siemens Core Competencies Electrical Engineering Automation / Maintenance Project Management Installation & Commissioning Procurement Process Improvement Manpower Planning Troubleshooting Profile Summary Result-oriented professional 27 leveraging years of enriching experience in Maintenance, Planning & Scheduling, Automation, Project Management, Erection & Commissioning and Troubleshooting at Steel Pipes, Cold Rolling Mills, Galvanising units Improved plant efficiency for Packaging Industry. Experienced in reliability oriented Predictive, Preventive Maintenance for Electrical . Incisive acumen in preventative maintenance program and driving continuous line improvement of AC/DC Drives, Milling Cutoff Machine, Seam Annealers, Edge Milling Machine, Slitting Line and Water Pump house of total Capacity 400 HP. Steered & ensured periodic and preventive maintenance are appropriately scheduled and emergency troubleshooting & installation of PLC System and Simo drives for the Barge Unloader System Competent in managing production & executing plans to ensure timely accomplishment of production targets within the cost parameters Expertise in swiftly ramping up projects (Green-field Pipe Manufacturing Projects) with a flair for adopting electrical engineering methodologies in compliance with quality standards Proactive planner with capability to nurture multi-cultural team at international locations Responsible for HSE activities of the Maintenance Department. Future Goals: Leveraging competency in managing operational aspects by effectively applying maintenance methodologies that enforce standards by minimizing exposure & risk ________________________________________________________________________________________